Overview Search Up
Download details
2015 - March - Hume - Regional Rail Link – SigView Train Control Sy 2015 - March - Hume - Regional Rail Link – SigView Train Control System

Ian Hume

BEng (Computer Systems) Hons

Wabtec Control Systems

This paper examines the development of the SigView Train Control System (TCS) that has been deployed for VLine under the Regional Rail Link (RRL) Project.

Starting with an overview of the Project and scope within the Train Control work package, the paper provides a high level overview of the functionality and architecture of SigView. Sections 4 and 5 provide some commentary on a number of key design considerations that were made during the Project.

The Project has been successful in achieving its operational goals and delivering on time and budget. The application of a System Engineering Approach towards the design of Signalling and Train Control Systems has led to many improvements in the methods of design, documentation and review. A strong focus on Systems Assurance and Human Factors coupled with collaborative approach of engaging end users has provided a positive introduction of the new Train Control System.

Data

Version
Size227.64 KB
Downloads3
Download Language
License
AuthorIan Hume
Website
Price
Created2024-10-21
Created byRichard Stephens
Changed2024-10-21
Changed byRichard Stephens

Only registered and logged in users can download this file.