David Port
G.M.K. Engineering Pty. Ltd.
The purpose of this paper is to explain the procedures developed and being implemented by the signalling discipline in State Rail to control the inspection and testing process.
In particular this paper will concentrate on the Commissioning Work Package.
|
|
Data |
Version | |
Size | 240.15 KB |
Downloads | 0 |
Download Language | |
License | |
Author | |
Website | |
Price | |
Created | 2015-12-28 |
Created by | |
Changed | 2023-04-15 |
Changed by | Nick Hughes |
Only registered and logged in users can download this file. |
|
|
|