Andrew Dwyer
Rail lnfrastructure Corporation
This paper describes the development, installation and commissioning of the Advanced Train Running lnformation Control System used within the Rail lnfrastructure Corporation, NSW. The paper details the background, control systems requirements, development and installations to date. lnformation on the system design including hardware and software are covered as is interface to other systems including I timetabling, station passenger information, electrical control, overhead power control and train radio.
|
|
Data |
Version | |
Size | 1.06 MB |
Downloads | 18 |
Download Language | |
License | |
Author | |
Website | |
Price | |
Created | 2015-12-28 |
Created by | |
Changed | 2023-04-15 |
Changed by | Nick Hughes |
Only registered and logged in users can download this file. |
|
|
|