Overview Search Up
Download details
2004 - March - McLean - Victorian Regional Fast Rail - A Control and Monitoring Perspec 2004 - March - McLean - Victorian Regional Fast Rail - A Control and Monitoring Perspective

Stuart McLean Bachelor Electronic Engineering, Hons (RMIT)

ALSTOM Australia

The Train Control and Monitoring System (TCMS) is the umbrella title given to the new Centralised Train Control (CTC) system and telemetry networks to be installed on the Regional Fast Rail (RFR) Project (Ballarat and Geelong corridors). This paper aims to provide an overview of the TCMS, detailing design decisions and equipment used and presenting a glimpse of the feature set offered by the new CTC system. It concludes by challenging engineers and managers to carefully consider the future specification design of control and monitoring systems.

Data

Version
Size2.19 MB
Downloads20
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.