Leon Zabel AMIRSE Signal Engineer - BElecEng GDipRailEng RPEQ
QR Limited
Neil Bruce AIRSE ATP Technical Coordinator - DipElecEng
QR Limited
Keith Walker FIRSE CDEC ATP Senior Project Coordinator
Principal Signal Engineer Worley Parson Rail
This paper discusses the design and operational enhancements that the Queensland Rail Limited (QR) Signals and Operation Systems (SAOS) Automatic Train Protection (ATP) design team have made to the Westect ATP system.
|
|
Data |
Version | |
Size | 706.71 KB |
Downloads | 1 |
Download Language | |
License | |
Author | |
Website | |
Price | |
Created | 2015-12-28 |
Created by | |
Changed | 2023-04-15 |
Changed by | Nick Hughes |
Only registered and logged in users can download this file. |
|
|
|