Adam Greaves BE (UTS), AMIRSE

Sydney Trains

Andrew Allison BE (UWS), AMIRSE

Sydney Trains

Microlok II computer-based interlockings with coded track circuits have replaced the last two electric train staff sections on the Transport for NSW network, Kiama – Berry and Berry – Bomaderry. Features include interface to a mechanical interlocking at Bomaderry and automatic working through Berry when unattended. While it will take time to confirm the anticipated reliability improvements, improved capacity has already been realised with time savings from elimination of the manual staff exchange. Motorists also benefit with reduced waiting times at level crossings in the vicinity of Berry station. The following describes the project from the design team perspective.

Data

Version
Size1.64 MB
Downloads35
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.