Overview Search Up
Download details
2013 - July - Atchison - Upgrading the TasRail Train Control Sy 2013 - July - Atchison - Upgrading the TasRail Train Control System

Brenton Atchison BSc (Hons), PhD

Siemens Rail Automation

Dirk Klokman BE, MBA

Siemens Rail Automation

David Baker DipPM

TasRail
This paper describes a current project to upgrade the TasRail Train Control system. Commencing in October 2012, the project is part of a larger infrastructure renewal program for the TasRail network.

The current TasRail Train Control operations are based on Track Warrant Control using verbal radio communications to grant authorities to trains and track vehicles. The upgraded Train Control System is based on North American Positive Train Control (PTC), and combines a graphical Train Control Centre with electronic communication to onboard computers equipped with display and GPS location. The solution allows for communication and monitoring of electronic track warrants and provides an example of applying current technology to support improved safety and capacity for a Train Control system in a cost-effective fashion.

Data

Version
Size860.21 KB
Downloads30
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.