Overview Search Up
Download details
1977 - March - Dawkins - Midland Control Ce 1977 - March - Dawkins - Midland Control Centre

WH Dawkins

Westrail

The recent commissioning of the above signalling project represented the final stage of Midland power signalling which began with the opening of the Midland Terminal on the 6th October, 1968. The power signalling at Midland Terminal at that time was operated from a small control panel in the Midland Station building whilst electro-mechanical signalling was operated from Box 'A' and mechanical signalling from Box 'B'.

Data

Version
Size1.17 MB
Downloads14
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.