Overview Search Up
Download details
1984 - March - Leclercq - South West Communicat 1984 - March - Leclercq - South West Communications

G LeClercq

Westrail

The scope of the South West project was, in order of importance, to provide communications circuits for:-

  • the signalling train control systems based at Picton: Picton to Coolup and Picton to Collie.
  • the emergency telephones installed along the tracks and at the road crossings. Those circuits are all connected to the controller at Picton.
  • the station masters to Picton Control (direct link).
  • the connection of the controllers at Midland and Picton (direct link)
  • the 2 VHF radio bases at Picton and Collie (later Cookernup)
  • PAX phones installed as extensions on Bunbury and Collie exchanges.

The existing overhead bearers in the area were inadequate to fulfil the new conmunications requirements and needed extensive upgrading. A cost study showed that, in the long term, a cable carrier system would be the most economical solution, and, furthermore would provide the base for a future upgrading of our communications network between Perth and Bunbury.

Data

Version
Size577.61 KB
Downloads14
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.