J.Keogh
Manager Operations Research Queensland Railways
Following over twelve months of investigation and negotiation Driver Only Operation was introduced into Queensland Railways on the Brisbane to Rockhampton section on Monday 14th May, 1990. This type of operation being successfully introduced without any loss of time due to industrial disputation.
|
|
Data |
Version | |
Size | 755.35 KB |
Downloads | 0 |
Download Language | |
License | |
Author | |
Website | |
Price | |
Created | 2015-12-28 |
Created by | |
Changed | 2023-04-15 |
Changed by | Nick Hughes |
Only registered and logged in users can download this file. |
|
|
|