Charles Page BSc. Elec/Electron, MBA, FIRSE
Director of Marketing & Sales Westinghouse Rail Systems Australia
The Windah-Grantleigh project arose out of Queensland Rail's strategic planning process that identified line capacity improvements required in the Blackwater system in Central Queensland. It was the first in a series of such projects conducted under a new contract model, designed to deliver cost effective and high quality upgrades in the minimum possible time in a collaborative environment. The Windah-Grantleigh was successfully delivered in a very challenging timescale and included a number of novel technical features. In particular, it was the first Australian application of the WESTRACE WNC in a hot standby configuration.
|
|
Data |
Version | |
Size | 865.78 KB |
Downloads | 10 |
Download Language | |
License | |
Author | |
Website | |
Price | |
Created | 2015-12-28 |
Created by | |
Changed | 2023-04-15 |
Changed by | Nick Hughes |
Only registered and logged in users can download this file. |
|
|
|