Overview Search Up
Download details
2010 - March - Symons - Design Acceptance - What About the Peo 2010 - March - Symons - Design Acceptance - What About the People?

Peter Symons F.I.R.S.E.

Engineering and Design Manager, Novo Rail

Most safety management activities for say, signalling and control systems concentrate on measuring conformance to processes against standards and procedures plus demonstration through risk assessments, V&V activities, arguments and evidence that the system as designed is safe and meets the requirements.

During these processes there is usually some emphasis on the human contribution e.g. Human factors as affecting operations and maintenance. However, to achieve an accepted design against a set of requirements can be problematic due to the behaviours of some of the actors, both in the transmitting and in the receiving sides of the process.

This paper will describe the approach by the Novo Rail alliance to improve the processes relating to the delegation of Engineering Authority and achieving a better Design Acceptance process to support its extensive program of works.

Data

Version
Size418.4 KB
Downloads18
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.