Download details |
2015 - March - Simmons - Regional Rail Link TCS - The view of an operator | ||||||||||||||||||||||||||||||||||
Martin SimmonsSimmons Rail ConsultantsThe Regional Rail Link (RRL) Project required the introduction of a new V/Line Train Control System (TCS) to control the signalling in both existing areas and the new greenfields areas. The result was a train control system that was commissioned by a focussed and co-operative team that has been fully accepted by the end users. This paper describes the journey from the point of view of the end user Train Controllers and Signallers. |
|