Overview Search Up
Download details
1991 - Aug - Hyland - Ranking of Signalling Infrastructure Renewals within a Suburban Railway Environ 1991 - Aug - Hyland - Ranking of Signalling Infrastructure Renewals within a Suburban Railway Environment

D HYLAND, BE, MIE Aust,

Director, Hyland Joy & Wardrop Pty Ltd

J R KENNEDY, ARMIT, MIE Aust,

Principal, Interlogis Consulting

This paper summarises the assumptions used and the methodology developed to rank projects to be included in the Signal Renewal and Modernisation Project.

The application of risk analysis techniques using as a comparative measure the loss exposure that could result from not doing the work was used to rank projects to provide the maximum return on investment and to ensure that only work that would have a significant impact on the operation of the system was done.

The evaluation method allows management to:-

  • identify the safety and service risk that could be eliminated by doing specific projects
  • assess the cost to provide a specified level of service and safety or alternatively the levels that can be provided for the funding available.

Data

Version
Size522.33 KB
Downloads9
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.