Overview Search Up
Download details
1994 - March - Moore, Topfer & Dwyer - CityRail Control Centre for the State Rail Authority, 1994 - March - Moore, Topfer & Dwyer - CityRail Control Centre for the State Rail Authority, NSW

Mr T. G. Moore, Train Control Systems Manager

CityRail Signal Renewal and Modernisation Programme

PART A - CONTROL CENTRE ARCHITECTURE AND FUNCTlOlN

Mr A. Topfer, Project Engineer Telemetry

CityRail Signal Renewal and Modernisation Programme

PART B - INTERFACE TO SIGNALLING

Mr A. Dwyer, Train Control Systems Engineer

CityRail Signal Renewal and Modernisation Programme

PART C - SYSTEMS INTERFACE AND GATEWAYS

CityRail serves Sydney and a population of 4.6 million people. The CityRail network extends over 150 km from Sydney to the North, South and West. It is intended that this network be controlled from one Control Centre for all Operations and Infrastructure functions. A two step strategy has been adopted to develop the engineering and organisational changes required for the final Control Centre.

The CityRail Control Centre at Central will consolidate the operations of signal boxes at Sydney, Strathfield, Sydenham, North Sydney, Hurstville, East Hills, Glenfield, Campbelltown, Liverpool, Sefton, Bankstown, Canterbury, Rhodes, Epping and Thornleigh. Operations Controllers, Mechanical Defects Officers and Passenger Information Officers will also be included in the Control Room.

The Control Centre will control over 2,000 train movements daily. The Control Centre will cover 35 signal interlockings and 11 4 stations. The signalling includes 1,900 signals, 400 points and 2,900 track circuits.

Data

Version
Size757.21 KB
Downloads31
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.