Technical Meeting Paper

200407 – Modernisation of KTMB’s Signalling & Telecommunication Systems

Downloads are only accessible for registered, logged in, users. Click here to log in.

The total route length of KTMB’s network amounts to approximately 1670 km and is mainly single track except for about 150 km of electrified double track sections around the capital city, Kuala Lumpur, for commuter services.

The signalling & communication system in KTMB is a complex mixed of equipment ranging from old antiquated mechanical signalling and open wire communication lines to modern microprocessor controlled signalling equipment fibre optic based transmission system.

Date of paper.

July 19th, 2004

Author Details

Keretapi Tanah Melayu Berhad

Scroll to Top