This paper outlines two signalling projects recently undertaken by the Public Transport
Authority of Western Australia (PTA). Each of these projects dealt with unusual circumstances, resulting from acts of vandalism. They both required innovative solutions as the approaches normally employed were unsuitable.

The Boom Gate Motor Protection Project is a solution to level crossing failures caused by vandals hanging on the boom arms at level crossings as they are returning to the upright position. This causes the boom motor to trip and the boom remains in the down position. The crossing remains in this state for some time or until a technician arrives and resets the boom motor circuit breaker. This leads to prolonged closure of the level crossing and encourages motorists to drive around the boom gates. This project addresses this problem, and also allows provision of other features such as enhanced monitoring of the level crossing equipment.

Date of paper.

July 30th, 2007

Author Details

Don Weerakody

Public Transport Authority

Scroll to Top