Technical Meeting Paper

198911 – Stepniewski – An Application of SSI to Epping

Downloads are only accessible for registered, logged in, users. Click here to log in.

Many papers have been published on the subject of the British Railways Solid State Interlocking (SSI). It is, therefore, assumed that most signal engineers have some idea of what SS1 is and its basic operation.

This paper focuses on describing the design and test process of applying SS1 to the Epping interlocking. It covers the areas of scheme design, SS1 location and circuit design, and in particular the customisation of the SS1 interlocking to the Epping requirements.

Date of paper.

November 29th, 1989

Author Details

R T Stepniewski

GEC Alsthom Australia

Scroll to Top