Technical Meeting Papers
Subcategories: 0
Files: 661
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content.
Only registered and logged in users can download files from this category.
Downloads: 661
Written by A.Baayens Technical Officer
Union Switch & Signa
Heavy Haul Railways are often owned and operated by bulk commodity producers. Their rail operators are focused
...
Size
56.95 KB
Lyle Jackson Managing Director
Union Switch & Signal Pty Ltd
Understanding and meeting the operators needs in a rapidly changing industry environment is a major challenge for
...
Size
176.74 KB
Raymond Balck FlRSE
Adtranz Signal
InterFlow is a communications based modular system that facilitates the control and automation of freight and country railway systems to a
...
Size
561.73 KB
Brian Luber
Since railways were established, many systems have been developed to ensure a safe and economic rail service. A signalling system which has played a major role here is that
...
Size
464.47 KB
Marc Chadwick (MTRE, BE elec, Grad Dip Bus)
Project Manager Westinghouse Brake and Signal Company (Australia) Limited
This paper describes the development of a Centralised
...
Size
820.22 KB
Tony Simes B.Eng (Elec), MIEAust, CPEng
Australian Transport Safety Bureau
The responsibility for rail safety regulation in Australia lies with each State or Territory. Each
...
Size
649.36 KB
John Aitken BE MlEEE AMIRSE
Aitken & Partners
Australia has a sad history of incompatibility in railway radio communications. There is no standard for radio communications on
...
Size
10.73 MB
Max Shuard CPEng, B. Bus (Transport) M.I.E. Aust, M.C.I.T.
National Rail Corporation Ltd.
The delivery of the 120 NR class locomotives to National Rail has been the largest
...
Size
404.58 KB
Wayne McDonald BE (Elec) FlRSE
Westinghouse Signals Australia
The Alice Springs to Darwin railway is the largest rail construction project that Australia has seen and is
...
Size
2.53 MB
Dr Tim Drew MBBS
Work Health Clinic - Mile End
New Medical Standards for Rail Safety Workers were adopted across all Australian States and Territories as of 1 July 2004. The
...
Size
397.9 KB
Trevor Moore B.Eng., MBA Technology Management, FIE (Aust), FIRSE
Australian Rail Track Corporation
signal at danger. This paper details the different types of overlaps, how
...
Size
112.91 KB
C.R. Turner MIRSE
Australian National
THIS PAPER OFFERS AN INSIGHT INTO THE APPLICATION OF MICROCODE THE SINGLE LINE BLOCK SIQIUILLING, BETWEEN DRY CREEX AND CRYSTAL
...
Size
735.9 KB
Dr. Holger M Becht PhD, BInfTech(Hons)
Safety & RAM Manager; Ansaldo STS, Brisbane
In virtually all safety-critical industries the operators of systems have to demonstrate a
...
Size
132.19 KB
Wayne Walsh
Network Manager, National Express Group (Australia) Pty Ltd
Size
114.36 KB
Brian Luber Sales Manager
Transportation Systems Siemens Ltd Australia
Size
1000.32 KB
Noel Samaan, PhD Senior Member IEEE (USA), Member IEE (UK), CPEng
R&D Software Systems Group Ansaldo STS
As the reliance on software is significantly increasing in railway
...
Size
130.95 KB
Stephen Burrows CEng MICE
Adelaide Rail Leader, Aurecon
Peter Stringer FIRSE
Signalling Accreditation Manager, Aurecon
Since time immemorial, signalling
...
Size
7.04 MB