Technical Meeting Papers |
Subcategories: 0 |
Files: 661 |
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content. |
Only registered and logged in users can download files from this category.
Downloads: 661
Graham Russell Chief Operating Officer
Ansaldo STS
Our industry is experiencing unprecedented investment and expansion driven by years of under investment in certain sectors ...
|
|
Size |
96.51 KB |
Warwick Allison FIRSE
RailCorp
When I was first approached to present a signalling paper to celebrate the 150th anniversary of railways in NSW, it was thought that an ...
|
|
Size |
3.37 MB |
Dr. Holger M Becht PhD, BInfTech(Hons)
Safety & RAM Manager; Ansaldo STS, Brisbane
In virtually all safety-critical industries the operators of systems have to demonstrate a ...
|
|
Size |
132.19 KB |
Luis Sanchez Bach of Electronic Eng (HON), MIEAUST
Public Transport Authority of Western Australia
The PTAWA (Public Transport Authority of Western Australia) introduced the ...
|
|
Size |
463.84 KB |
Wayne Walsh
Network Manager, National Express Group (Australia) Pty Ltd
|
|
Size |
114.36 KB |
Richard M Robinson, BE BA FIEAust MSFPE
Director, R2A Pty Ltd
statutory, regulatory and common law obligations have been met. It is primarily a demonstration that all sensible ...
|
|
Size |
392.29 KB |
Paul Eyre Project Manager
Ansaldo STS / Union Switch & Signal Pty Ltd
The 71 km extension of the Perth electrified rail network from Perth through to Mandurah, commonly ...
|
|
Size |
95.42 KB |
Brian Luber Sales Manager
Transportation Systems Siemens Ltd Australia
|
|
Size |
1000.32 KB |
Robert E Piper, REA, MIRSE, ONTRACK Ken K Ashman, AMIRSE, ONTRACK Myles A Radford, ONTRACK
The Auckland Electrification Project (AEP) and Develop Auckland Rail Transport ...
|
|
Size |
89.68 KB |
Brenton Atchison BSc (Hons), PhD
Siemens Rail Automation
Dirk Klokman BE, MBA
Siemens Rail Automation
David Baker DipPM
TasRail This paper...
|
|
Size |
860.21 KB |
Maurice Taylor
Project Safeworking Officer A.S.W.
A large part of our responsibility as Train Controllers has been to influence the design of the system to suit the operator. ...
|
|
Size |
199.33 KB |
Noel Samaan, PhD Senior Member IEEE (USA), Member IEE (UK), CPEng
R&D Software Systems Group Ansaldo STS
As the reliance on software is significantly increasing in railway ...
|
|
Size |
130.95 KB |
FC Cockram Corporate Relations Manager
Tranz Rail Ltd
|
|
Size |
322.38 KB |
Stephen Burrows CEng MICE
Adelaide Rail Leader, Aurecon
Peter Stringer FIRSE
Signalling Accreditation Manager, Aurecon
Since time immemorial, signalling ...
|
|
Size |
7.04 MB |
Tony Vaz, F.I.R.S.E.
Project Manager Signal Renewal & Modernisation Programme North State Rail Authority of N.S. W.
Peter Symons, F.I.R.S.E.
Manager N.S. W....
|
|
Size |
683.56 KB |
Anthony Godber BSc(Eng), CEng, MIET, MIRSE
Pilbara Iron
Signalling of any railway aims to meet the often conflicting demands of safety and operational efficiency in the most ...
|
|
Size |
142.6 KB |
George Nikandros BE CPEng RPEQ FIRSE MIEAust MACS
Chairman aSCSa1
In Australia, both the model rail safety legislation and the model workplace health and safety legislation ...
|
|
Size |
234.74 KB |
Klaus Altehage MSc, MIRSE
SelectRail (Australia) Pty Ltd
Railway infrastructure data is essential for different stages of an interlocking application; not only directly for ...
|
|
Size |
1.37 MB |
Georgina Hartwell MEng (Hons) AMIRSE MIET
Network Rail Consulting
The aim of this paper is to provide a project description and update to Network Rail’s Thameslink Programme ...
|
|
Size |
778.94 KB |