2010 - July - Sanchez - ATP Update Transponder Positio 2010 - July - Sanchez - ATP Update Transponder Positioning

Luis Sanchez Bach of Electronic Eng (HON), MIEAUST

Public Transport Authority of Western Australia

The PTAWA (Public Transport Authority of Western Australia) introduced the Ansaldo L10,000 ATP system (also known as ATC1 or EBICAB) into its rail network in 1990/1991.

From the beginning, a point of contention between the PTA and its contractors has been the positioning of ATP Update Transponders. The number and placement of transponders required to minimise the "delay effects" caused by the use of discrete information points as "infill", or the need for updates at all, will be examined.

This paper will demonstrate the different methods used by the PTAWA to determine the positioning and number of ATP Update Transponders between signals.

The use of Update Transponders as "Infill" seems also to be losing favour in the signalling world due to the perceived delay effects caused by intermittent systems. A new method of determining Update Transponder positioning is proposed which demonstrates that intermittent systems can provide good performance at a reasonable cost.

Most of this document and calculations assume the use of the Ansaldo L10,000 system as installed in the PTA. Many of the concepts and ideas may be directly translated to other intermittent ATP systems such as ETCS level 1.

Data

Version
Size463.84 KB
Downloads26
Download Language
License
Author
Website
Price
Created2015-12-28
Created by
Changed2023-04-15
Changed byNick Hughes

Only registered and logged in users can download this file.