Technical Meeting Papers

Technical Meetings are held three times per year.
Papers are available here for download.
You must be logged in to be able to download content.


200803 – Kaiser & Nielson – The Core Of ATP – Data Engineering

By: Warren Kaiser & Stein Nielsen
Date Presented: March 14th, 2008

Warren Kaiser (Design Engineer, ATP Pilot Trial)Stein N


Read More...


200710 – Nugent – Using Simulation Techniques to Quantify the Capacity Benefits of Signalling Upgrades

By: Mischa Nugent
Date Presented: October 26th, 2007

Mischa NugentRail capacity and the lack thereof is curr


Read More...


200710 – Davey – Applying Systems Engineering to Optimise Victoria’s Public Transport Services

By: Kevin Davey
Date Presented: October 26th, 2007

Kevin DaveyThe Department of Infrastructure has used a


Read More...


200710 – Bryce – Victoria’s New Ticketing Solution

By: Duncan Bryce
Date Presented: October 26th, 2007

Duncan BryceThis paper* will provide an overview of Vic


Read More...


200710 – Murphy – The Application of ERTMS/ETCS System

By: Eddie Murphy
Date Presented: October 26th, 2007

Eddie Murphy HND Engineering, MIRSEWestinghouse Rail Sy


Read More...


200707 – Bilston – Design Development of Communications System for the Pilbara Iron Ore and Infrastructure Project

By: Simon Bilston
Date Presented: July 30th, 2007

Simon Bilston B Eng, MIEAustAnsaldo STS Australia Pty L


Read More...


200707 – Samaan – A Position Paper on Software Validation and Dependability for Safety Critical Systems

By: Noel Samaan
Date Presented: July 30th, 2007

Noel Samaan, PhD Senior Member IEEE (USA), Member IEE (


Read More...


200707 – Webb – Optical Fibre for Freight Railways: Or How A Radio Communications Engineer Saw the Light

By: John Webb
Date Presented: July 30th, 2007

John Webb BE (Elec), MIEAustCOMMSIGTelecommunications c


Read More...


200707 – Eyre – Signalling of the Southern Suburbs Railway

By: Paul Eyre
Date Presented: July 30th, 2007

Paul Eyre Project ManagerAnsaldo STS / Union Switch & S


Read More...


200703 – Wardrop & Caldwell – Application of Problem Space Search to Heavy Haul Scheduling and Infrastructure Planning

By: Alex Wardrop
Date Presented: July 30th, 2007

Alex Wardrop BSc (Hons) MEngSciDavid Caldwell BEng (Hon


Read More...

202503 – Afshar – CBTC Signalling System & Emerging Technologies

Author(s): Parisa Afshar

Read More

202503 – Moore – Signal Design Report: What Is It and Why Do We Need It?

Author(s): Trevor Moore

Read More

2004 – July – Modernisation of KTMB’s Signalling & Telecommunication Systems

Author(s):

The total route length of KTMB’s network amounts to approximately 1670 km and is mainly single track except for about 150 km of electrified double track sections around the capital city, Kuala Lumpur, for commuter services.

Read More

2003 – July – Lowe – Technical Issues for City Rail Project

Author(s): Robert Lowe

Robert Lowe This paper describes the technical configuration of the Perth City Section of the South West Metropolitan Railway as defined in the Project Master Plan and subsequent Tender documentation. The form of construction contract is a Relationship based Design and Construct so detailed design is still to be complete. Consequently parts of the completed project may be different from that described herein.

Read More

2003 – July – Lauder – Train Control Systems – Time for a Paradigm Shift!

Author(s): Malcolm Lauder

Malcolm Lauder The time for a wholistic approach to delivery of Train Control Systems is nigh !  

Read More

2001 – March – Garrett – Brisbane Airport Rail Link Project – Overview

Author(s): Mike Garrett

Mike Garrett Airtrain Citylink is a Queensland company formed specifically to undertake the development and operation of a rail link between Brisbane Airport and the city of Brisbane on a build, own, operate, transfer (BOOT) basis. See attached Figure 1. Airtrain's shareholders are Colonial Group Staff Superannuation Scheme, Airtrain Trust (4 superannuation funds), Hyder Investments, GIO Australia, CDC Projects, Transfield & 26 smaller investers.

Read More

Scroll to Top