Technical Meeting Paper
196510 – Rees – Reconstruction of Communications Pole Line
Downloads are only accessible for registered, logged in, users. Click here to log in.
The attached drawings illustrate the work undertaken and the method of construction, The automatic sequence of switching operations is illustrated in 8 stages for two 16 pole sections AB and BC.
For a detailed description of the project and the methods used, reference should be made to a paper by Messrs, Taylor, Huston and Sayer delivered before the Engineering Conference 1965 in Perth and printed in the September issue of the Journal of the Institution of Engineers, Australia.