Technical Meeting Paper

196903 – Graham – Power Signalling Construction Practices Victorian Railways

Downloads are only accessible for registered, logged in, users. Click here to log in.

The scope of this paper is to outline the organisation of the signalling construction section of the Victorian Railways, detailing materials, machinery and techniques currently employed in all phases of the installation of power signalling and its associated apparatus and the extent to which signal ling equipment is pre-fabricated.

Date of paper.

March 15th, 1969

Author Details

BW Graham

MIE Australia

Scroll to Top