Technical Meeting Paper
198411 – Turner – Application of Microcode to Single Line Block Signalling: Dry Creek to Crystal Brook
Downloads are only accessible for registered, logged in, users. Click here to log in.
This paper offers an insight into the application of microcode the single line block signalling, between Dry Creek and Crystal Brook.
The specific constraints imposed by the rail system are listed followed by an explanation of the microcode system and then the application of the microcode system to suit Australian national’s block signalling requirements.