Technical Meeting Paper

200007 – Knowlton & Godber – Commissioning & Maintenance of an Integrated System

Downloads are only accessible for registered, logged in, users. Click here to log in.

Union Switch & Signal Pty Ltd. & Hamersley Iron Pty Ltd Hamersley Iron has recently commissioned its Integrated Control & Signalling System to provide total control of train movements on its heavy haul railway in Western Australia.

This paper discusses some of the issues associated with the testing and commissioning of a complete new system covering the whole railway, with particular reference to the systems integration testing required.

The challenges and opportunities presented for the maintenance of the railway are then discussed. Finally, the further developments made possible by the new system are outlined.

Date of paper.

July 24th, 2000

Author Details

P Knowlton & A M Godber

Union Switch & Signal Pty & Hamersley Iron Pty

Scroll to Top