Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 661

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 661
pdf0 1997 - July - Luber - Track Vacancy Detection Equipment Using Axle Counter

Brian Luber Sales Manager

Transportation Systems Siemens Ltd Australia

 



Size 1000.32 KB
pdf1 2008 - Nov - Piper, Ashman, & Radford - Interfaces and Complexities Affecting Signalling Works - Dart and Aep

Robert E Piper, REA, MIRSE, ONTRACK
Ken K Ashman, AMIRSE, ONTRACK
Myles A Radford, ONTRACK

The Auckland Electrification Project (AEP) and Develop Auckland Rail Transport

...

Size 89.68 KB
pdf2 2013 - July - Atchison - Upgrading the TasRail Train Control System

Brenton Atchison BSc (Hons), PhD

Siemens Rail Automation

Dirk Klokman BE, MBA

Siemens Rail Automation

David Baker DipPM

TasRail
This paper

...

Size 860.21 KB
pdf3 1987 - March - Pallister - The Signalling Project

G.R. Pallister

Project Manager, Westinghouse Brake & Signal Co. (Australia) Ltd.

The Signalling Project is composed of two separate contracts, Stage One and Stage Two. The

...

Size 598.05 KB
pdf4 2002 - April - Badger, Bhattacharjee and Musicki - Passenger Security System for State Rail Authority of New South Wales

Alexander Badger BE (Hons) EE,
Shubroto Bhattacharjee B Tech (Hons) EE, DMM, MIEAust
Darko Musicki PhD

Engineering Design Group, Tyco Integrated Systems Rydalmere NSW

...

Size 629.91 KB
pdf5 2014 - March - Blakeley-Smith - Forty Years of 25 kV Electrification in Australia

Andrew Blakeley-Smith BSc (Hons), MIEAust, MIRSE


Director, Andrew Blakeley-Smith & Associates

The first 25kV system planning in Australia started in 1974 for Adelaide but the

...

Size 1.87 MB
pdf6 1993 - Nov - Taylor - Alternative Safe Working (ASW) Development & Operations

Maurice Taylor

Project Safeworking Officer A.S.W.

A large part of our responsibility as Train Controllers has been to influence the design of the system to suit the operator.

...

Size 199.33 KB
pdf7 1987 - March - Small - Overview of North Island Main Truck Electrification

A.F. SMALL, M.E. Ph.D C. Eng., M.LC.E, M.NZ.LR, F.C.I.T.

GROUP MANAGER (PREIGET BUSINESS GROUP) NEW ZEALAND RAILWAYS CORPOMTION

The electrification of the North island Main

...

Size 853.5 KB
pdf8 2007 - July - Samaan -A Position Paper on Software Validation and Dependability for Safety Critical Systems

Noel Samaan, PhD Senior Member IEEE (USA), Member IEE (UK), CPEng

R&D Software Systems Group Ansaldo STS

As the reliance on software is significantly increasing in railway

...

Size 130.95 KB
pdf9 1998 - July - Cockram - Keynote Address - Down the Privatisation Road

FC Cockram Corporate Relations Manager

Tranz Rail Ltd

 



Size 322.38 KB
pdf10 1984 - March - Hamersley Iron - Railway Signals & Communications Departme



Size 718.57 KB
pdf11 2011 - July - Burrows & Stringer - Folding Signal Posts - Myth or Practical Solution

Stephen Burrows CEng MICE

Adelaide Rail Leader, Aurecon

Peter Stringer FIRSE

Signalling Accreditation Manager, Aurecon

Since time immemorial, signalling

...

Size 7.04 MB
pdf12 1995 - July - Vaz & Symons - Wyong Resignalling

Tony Vaz, F.I.R.S.E.

Project Manager Signal Renewal & Modernisation Programme North State Rail Authority of N.S. W.

Peter Symons, F.I.R.S.E.

Manager N.S. W.

...

Size 683.56 KB
pdf13 2007 - March - Godber - Fundamentals of Signalling a Heavy Haul Railway

Anthony Godber BSc(Eng), CEng, MIET, MIRSE

Pilbara Iron

Signalling of any railway aims to meet the often conflicting demands of safety and operational efficiency in the most

...

Size 142.6 KB
pdf14 2005 - Aug - Pore - Presidential Address

Jacques PORE, ALSTOM

It is a real pleasure, and I have to confess that I feel a bit nervous, to be standing here in front of this distinguished assembly, being the fifth non-British

...

Size 321.4 KB
pdf15 2011 - March - Nikandros - Signalling So Far As Is Reasonably Practicable

George Nikandros BE CPEng RPEQ FIRSE MIEAust MACS

Chairman aSCSa1

In Australia, both the model rail safety legislation and the model workplace health and safety legislation

...

Size 234.74 KB
pdf16 2004 - October - Erdos - The Evolution of Rail Safety

George D Erdos B. Tech Elec, FIEAust, CPEng, FIRSE, FPWI, MIIE

Australian Transport Safety Bureau

Trains and railways have captured the imagination of people for more than 200

...

Size 564.67 KB
pdf17 2014 - March - Altehage - Generating Consistent Infrastructure Data for Interlocking Applications

Klaus Altehage MSc, MIRSE

SelectRail (Australia) Pty Ltd

Railway infrastructure data is essential for different stages of an interlocking application; not only directly for

...

Size 1.37 MB
pdf18 2015 - October - Hartwell - A Review of the Thameslink Programme

Georgina Hartwell MEng (Hons) AMIRSE MIET

Network Rail Consulting

The aim of this paper is to provide a project description and update to Network Rail’s Thameslink Programme

...

Size 778.94 KB
pdf19 1989 - Nov - Ackland - Epping Line Resignalling

GRAEME ACKLAND B. App. Sci (Elec)

SIGNAL INTERLOCKING ENGINEER PUBLIC TRANSPORT CORPORATION - VICTORIA (THE MET)

The Clifton Hill to Epping line was first constructed in

...

Size 553.35 KB