Technical Meeting Papers

Technical Meetings are held three times per year.
Papers are available here for download.
You must be logged in to be able to download content.


201503 – Heibel – CBTC for Mixed Traffic

By: Dr Frank Heibel
Date Presented: March 20th, 2015

Frank Heibel PhD MSc (Hon) MIEAust CPEng FIRSEDoc Frank


Read More...


201503 – Yum & Mahmood – Practical Application of Semiformal RAM Methodology

By: Kai Yum & Tariq Mahmood
Date Presented: March 20th, 2015

Kai Yum BEng, BSc, GradDipSig&CommsDEDJTRTariq Mahm


Read More...


201503 – Ramsdale – Transforming V/Line’s Regional Rail Network

By: David Ramsdale
Date Presented: March 20th, 2015

David Ramsdale B.Bus, CPA, MBASenior Associate - Advisi


Read More...


201503 – Baird – Victorian Signalling Principles

By: Robert Baird
Date Presented: March 20th, 2015

Robert Baird BE (Elec) Hons, CEng, FIRSE, MIETRail Netw


Read More...


201503 – Moore – Standards and the Signal Engineer

By: Trevor Moore
Date Presented: March 20th, 2015

Trevor Moore B Eng, MBA, FIRSE, FIEAustAustralian Rail


Read More...


201503 – Simmons – Regional Rail Link TCS – The View of an Operator

By: Martin Simmons
Date Presented: March 20th, 2015

Martin SimmonsSimmons Rail ConsultantsThe Regional Rail


Read More...


201503 – George – 2.2 kV Three Phase Signalling Power Network for Regional Rail

By: Stephen George
Date Presented: March 20th, 2015

Stephen George Dip Eng, FIEAust, CPEngOPUS RailThe sign


Read More...


201407 – Banerjee – Monologue of a Byte by Byte Traveller

By: Somnath Banerjee
Date Presented: July 25th, 2014

Somnath Banerjee B. Tech, FIRSE, MIEEE, MIRSTE, RPEQThe


Read More...


201407 – Moore – Signalling Concept Plan – RIP

By: Trevor Moore
Date Presented: July 25th, 2014

Trevor Moore B Eng, MBA, FIRSE, FIEAustAustralian Rail


Read More...


201407 – Hillcoat & Clancy – Increasing Capacity in the Hunter Network – Streamlining Train Control

By: Brett Hillcoat & Michael Clancy
Date Presented: July 25th, 2014

Brett Hillcoat G.C.Mgmt, Dip Bus ProgParsons Brinckerho


Read More...

202503 – Afshar – CBTC Signalling System & Emerging Technologies

Author(s): Parisa Afshar

Read More

202503 – Moore – Signal Design Report: What Is It and Why Do We Need It?

Author(s): Trevor Moore

Read More

2004 – July – Modernisation of KTMB’s Signalling & Telecommunication Systems

Author(s):

The total route length of KTMB’s network amounts to approximately 1670 km and is mainly single track except for about 150 km of electrified double track sections around the capital city, Kuala Lumpur, for commuter services.

Read More

2001 – March – Garrett – Brisbane Airport Rail Link Project – Overview

Author(s): Mike Garrett

Mike Garrett Airtrain Citylink is a Queensland company formed specifically to undertake the development and operation of a rail link between Brisbane Airport and the city of Brisbane on a build, own, operate, transfer (BOOT) basis. See attached Figure 1. Airtrain's shareholders are Colonial Group Staff Superannuation Scheme, Airtrain Trust (4 superannuation funds), Hyder Investments, GIO Australia, CDC Projects, Transfield & 26 smaller investers.

Read More

2001 – July – Stepniewski – Blacktown’s VDU Signalling Control System “Sigview”

Author(s): Richard Stepniewski

Richard Stepniewski Alstom's VDU Control System, called SigView, was successfully commissioned at Blacktown, in two stages as part of the Blacktown Resignalling Project: - Stage 1: control of Blacktown and Quakers Hill in December 1999. - Stage 2: control of Richmond Line and Quakers Hill in March 2000.

Read More

2000 – March – Furness & Clarke – Maintaining for Reliability

Author(s): John Furness & John Clarke

John Furness & John Clarke ABB Engineering Construction are responsible for maintaining various components of the Victorian Rail system on behalf of the newly franchised businesses. The transition from publicly owned railway authority to private industry, specialist maintenance provider has required considerable change at both the organisational and individual staff levels. The process has also uncovered a number of deficiencies in the pre-existing maintenance structure and practices that do not meet the needs and performance requirements of the new Operators. ABB are currently developing and planning for new procedures and practices, etc ,where necessary, to meet our client's expectations for continuos improvements in the overall railway system reliability to achieve and exceed the new performance benchmarks

Read More

Scroll to Top