200410 – Drew – National Standard for Health Assessment of Rail Safety Workers
Author(s): Dr Tim Drew
Date presented:
Dr Tim Drew MBBSWork Health Clinic - Mile EndNew Medica
Technical Meetings are held three times per year.
Papers are available here for download.
You must be logged in to be able to download content.
The total route length of KTMB’s network amounts to approximately 1670 km and is mainly single track except for about 150 km of electrified double track sections around the capital city, Kuala Lumpur, for commuter services.
Robert Lowe This paper describes the technical configuration of the Perth City Section of the South West Metropolitan Railway as defined in the Project Master Plan and subsequent Tender documentation. The form of construction contract is a Relationship based Design and Construct so detailed design is still to be complete. Consequently parts of the completed project may be different from that described herein.
Malcolm Lauder The time for a wholistic approach to delivery of Train Control Systems is nigh !
Mike Garrett Airtrain Citylink is a Queensland company formed specifically to undertake the development and operation of a rail link between Brisbane Airport and the city of Brisbane on a build, own, operate, transfer (BOOT) basis. See attached Figure 1. Airtrain's shareholders are Colonial Group Staff Superannuation Scheme, Airtrain Trust (4 superannuation funds), Hyder Investments, GIO Australia, CDC Projects, Transfield & 26 smaller investers.
Dr Tim Drew MBBSWork Health Clinic - Mile EndNew Medica
Les Brearley BE (Elect), Grad Dip Bus, FIRSE, RPEQJavie
Tony Simes B.Eng (Elec), MIEAust, CPEngAustralian Trans
Owen Clenick BE(Hons), MIRSE, RPEQRegional Manager Inve
Raja Azizi Raja Daud B.E (Hons) in ElectronicUnion Swit
Peter Jones (AMIRSE)The intent of this Paper is to prov
Stephen McClary BSc (Hons) CEng MIEE MIRSEHead of Engin
George D Erdos B. Tech Elec, FIEAust, CPEng, FIRSE, FPW