Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 756

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 756
pdf0 1997 - July - Lauder - CTC Technology for Indonesia



Size 1.49 MB
pdf1 1993 - April - Scheck - Strategies for Train Control Within QR - Part 1: Universal Traffic Control

Mike Schek (QR)

This paper looks briefly at the major events and influences which led to the in-house development of QR's Universal Traffic Control system. This evolution is based on a

...

Size 703.79 KB
pdf2 2004 - October - Brearley, Gonzalez, Tran and Kwong - Postgraduate Program in Railway Signalling: Experience One Year On

Les Brearley BE (Elect), Grad Dip Bus, FIRSE, RPEQ
Javier Gonzalez B E (Hons)
Lee Tran BE (Elect), MIRSE, MIEAust
A/Prof Ken Kwong B E (Hons), PhD, FIEAust, FIEE

Risk

...

Size 218.79 KB
pdf3 2009 - Nov - Hawes & Magyla - Sydney Metropolitan Freight Network

Eddie Hawes HTEC, TMIEAust CEngT, IEng, MIRSE, MIET, GCCI

AECOM

Dr Tomas Magyla PhD, MSc(Hons), BSc, MIRSE, AIPM, APM, MIET, MAET

AECOM

The paper describes

...

Size 3.74 MB
pdf4 1990 - Nov - Deveney - Alternative Safe Working System (ASW)

T. DEVENEP A.R.M.I.T., M.I.R.S.E.

ENGINEERING MANAGER PUBLIC TRANSPORT CORPORATION VICTORIA

The Alternative Safeworking System is currently being developed by the Public

...

Size 1.11 MB
pdf5 1996 - March - Knowlton - Continuous In-Cab Signalling & ATP

P. Knowlton

Union Switch & Signal Pty. Ltd.

This paper describes the technical solutions reached to satisfy the requirements of a heavy haul railway for a modern integrated

...

Size 542.6 KB
pdf6 2003 - November - Morrison - Maintenance & Asset Management

Alistair Morrison National Sales & Business Development Manager

Information Solution, ALSTOM Australia

The scope of this paper is to promote discussion and review of the

...

Size 139.77 KB
pdf7 1993 - Nov - Cross - A Journey Through Train Detection

P.J. Cross

Technical Director Westinghouse Signals Limited

In my opinion it's all about finding out where the trains are (or to be pedantic but more precise, where they

...

Size 816.69 KB
pdf8 2002 - April - Kjaer-Olsen - "From Track to Customer" Signalling, Train Control and Real Time Information Systems in Queensland Rail, Australia

Kim Kjaer-Olsen (B. Sc. EE, MIRSE)

Queensland Rail

This paper describes some key systems deployed in Queensland Rail's (QR) signalling, train control, real time, passenger

...

Size 1.83 MB
pdf9 2012 - Oct - Walsh - Audio Frequency Track Circuit Reliability Investigation

Alexander Walsh BEng(Computer)

RailCorp

Audio frequency track circuits are used extensively in railway signalling to detect the presence or absence of rail traffic. When track

...

Size 1.04 MB
pdf10 2001 - March - Jackson - The Railway Signalling Industry - A Millennium of Change and Management Challenges

Lyle Jackson Managing Director

Union Switch & Signal Pty Ltd

Change has had a significant impact on the railway industry over the past decade and will continue to provide

...

Size 447.84 KB
pdf11 2012 - Oct - Gifford - Maintaining and Designing Signalling Systems for Reliability, Availability and Maintainability – Challenging the Paradigms, Beliefs and Sacred Cows

John Gifford FIRSE Signalling & Compliance Manager, Hunter Valley

Australian Rail Track Corporation

Most of you will be aware of the term Reliability Centred Maintenance

...

Size 571.56 KB
pdf12 2000 - July - Knowlton & Godber - Commissioning & Maintenance of an Integrated System

P. Knowlton and A M Godber

Union Switch & Signal Pty Ltd. & Hamersley Iron Pty Ltd

Hamersley Iron has recently commissioned its Integrated Control & Signalling

...

Size 611.75 KB
pdf13 1999 - July - Kjaer-Olsen - Customer Information & Real Time Distributed Sytems Queensland Rail Australia

Kim Kjaer-Olsen

Queensland Rail PO Box 1429 Brisbane, AUSTRALIA. 4000

This paper describes Queensland Rail's Train Control (or Train Dispatching), Real Time Information and

...

Size 1.51 MB
pdf14 2003 - November - Brearley - Supporting Technology - The CRC Course in Signal Engineering

Les Brearley BE (Elect), Grad Dip Bus, FIRSE, RPEQ

Manager, Systems Safety and Quality Union Switch & Signal Pty Ltd

The technology supplied by the railway signalling industry

...

Size 73.84 KB
pdf15 2008 - March - Coenraad - Presidential Address - Sustainable Signalling

Win Coenraad

Control and Signalling (CCS) systems are expensive to develop, and are even more expensive in terms of system assurance activities and system acceptance. Yet they are

...

Size 69.43 KB
pdf16 2005 - Oct - Moore - Signalling Code of Practice - An Australian Perspective

Trevor Moore FIRSE, FIE Aust

Endeavour Management & Engineering

The railways in Australia developed on a state basis before federation. Significant differences including gauge

...

Size 90.48 KB
pdf17 2010 - March - McGregor - Using Six Sigma to Improve Track Circuit Reliability

Peter McGregor BEng(Elect) Grad Dip (Systems) MIRSE

Head of Signalling Design – Professional Services Division, RailCorp

Is Six Sigma just another management fad? Is it just

...

Size 710.3 KB
pdf18 2004 - July - Clenick - WESTRACE In Malaysia

Owen Clenick BE(Hons), MIRSE, RPEQ

Regional Manager Invensys Rail Systems Australia Westinghouse Signals Australia Division

This paper overviews two WESTRACE computer based

...

Size 614.65 KB
pdf19 1991 - Aug - Hyland - Ranking of Signalling Infrastructure Renewals within a Suburban Railway Environment

D HYLAND, BE, MIE Aust,

Director, Hyland Joy & Wardrop Pty Ltd

J R KENNEDY, ARMIT, MIE Aust,

Principal, Interlogis Consulting

This paper summarises the

...

Size 522.33 KB