Technical Meeting Papers
Subcategories: 0
Files: 756
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content.
Only registered and logged in users can download files from this category.
Downloads: 756
Mike Schek (QR)
This paper looks briefly at the major events and influences which led to the in-house development of QR's Universal Traffic Control system. This evolution is based on a
...
Size
703.79 KB
Les Brearley BE (Elect), Grad Dip Bus, FIRSE, RPEQ Javier Gonzalez B E (Hons) Lee Tran BE (Elect), MIRSE, MIEAust A/Prof Ken Kwong B E (Hons), PhD, FIEAust, FIEE
Risk
...
Size
218.79 KB
Eddie Hawes HTEC, TMIEAust CEngT, IEng, MIRSE, MIET, GCCI
AECOM
Dr Tomas Magyla PhD, MSc(Hons), BSc, MIRSE, AIPM, APM, MIET, MAET
AECOM
The paper describes
...
Size
3.74 MB
T. DEVENEP A.R.M.I.T., M.I.R.S.E.
ENGINEERING MANAGER PUBLIC TRANSPORT CORPORATION VICTORIA
The Alternative Safeworking System is currently being developed by the Public
...
Size
1.11 MB
P. Knowlton
Union Switch & Signal Pty. Ltd.
This paper describes the technical solutions reached to satisfy the requirements of a heavy haul railway for a modern integrated
...
Size
542.6 KB
Alistair Morrison National Sales & Business Development Manager
Information Solution, ALSTOM Australia
The scope of this paper is to promote discussion and review of the
...
Size
139.77 KB
P.J. Cross
Technical Director Westinghouse Signals Limited
In my opinion it's all about finding out where the trains are (or to be pedantic but more precise, where they
...
Size
816.69 KB
Kim Kjaer-Olsen (B. Sc. EE, MIRSE)
Queensland Rail
This paper describes some key systems deployed in Queensland Rail's (QR) signalling, train control, real time, passenger
...
Size
1.83 MB
Alexander Walsh BEng(Computer)
RailCorp
Audio frequency track circuits are used extensively in railway signalling to detect the presence or absence of rail traffic. When track
...
Size
1.04 MB
Lyle Jackson Managing Director
Union Switch & Signal Pty Ltd
Change has had a significant impact on the railway industry over the past decade and will continue to provide
...
Size
447.84 KB
John Gifford FIRSE Signalling & Compliance Manager, Hunter Valley
Australian Rail Track Corporation
Most of you will be aware of the term Reliability Centred Maintenance
...
Size
571.56 KB
P. Knowlton and A M Godber
Union Switch & Signal Pty Ltd. & Hamersley Iron Pty Ltd
Hamersley Iron has recently commissioned its Integrated Control & Signalling
...
Size
611.75 KB
Kim Kjaer-Olsen
Queensland Rail PO Box 1429 Brisbane, AUSTRALIA. 4000
This paper describes Queensland Rail's Train Control (or Train Dispatching), Real Time Information and
...
Size
1.51 MB
Les Brearley BE (Elect), Grad Dip Bus, FIRSE, RPEQ
Manager, Systems Safety and Quality Union Switch & Signal Pty Ltd
The technology supplied by the railway signalling industry
...
Size
73.84 KB
Win Coenraad
Control and Signalling (CCS) systems are expensive to develop, and are even more expensive in terms of system assurance activities and system acceptance. Yet they are
...
Size
69.43 KB
Trevor Moore FIRSE, FIE Aust
Endeavour Management & Engineering
The railways in Australia developed on a state basis before federation. Significant differences including gauge
...
Size
90.48 KB
Peter McGregor BEng(Elect) Grad Dip (Systems) MIRSE
Head of Signalling Design – Professional Services Division, RailCorp
Is Six Sigma just another management fad? Is it just
...
Size
710.3 KB
Owen Clenick BE(Hons), MIRSE, RPEQ
Regional Manager Invensys Rail Systems Australia Westinghouse Signals Australia Division
This paper overviews two WESTRACE computer based
...
Size
614.65 KB
D HYLAND, BE, MIE Aust,
Director, Hyland Joy & Wardrop Pty Ltd
J R KENNEDY, ARMIT, MIE Aust,
Principal, Interlogis Consulting
This paper summarises the
...
Size
522.33 KB