Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 756

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 756
pdf0 1987 - Nov - Holland - Aberdeen - Werris Creek CTC - Communications

N. Holland

Westinghouse Systems

The Muswellbrook to Werris Creek rail section is an important link in the total SRA upgrade of country rail routes. The section is located

...

Size 451.39 KB
pdf1 1970 - Nov - Holman - Melbourne Automatic Hump Yard

EPA Holman A.M.I.E.E.

Westinghouse Brake and Signal Co. Ltd.

This paper has been written following the recent bringing into service of the Automatic Hump Yard in Melbourne. 

...

Size 1.29 MB
pdf2 2015 - October - Moore - Signalling Principles of ARTC HOT

Trevor Moore  BEng, MBA, FIRSE, FIE Aust 

Australian Rail Track Corporation

The Australian Rail Track Corporation was established in 1998 to manage the below rail assets from

...

Size 592.34 KB
pdf3 1994 - Aug - Haley - Wollingford Lifting Bridge

David Haley MIRSE

Signals & Operational Systems Corporate Services Engineering Division Queensland Rail

In Queensland, private railways operated for cane haulage by sugar

...

Size 595.19 KB
pdf4 1972 - Nov - Tooth - A New Approch to Power Signalling

AD Tooth ASTC MIEAust MIEE

Chief Engineer, Masters Equipment Pty Ltd

This paper deals with a new approach to the problems of railway signalling using the technology which has

...

Size 359.85 KB
pdf5 1948 - May - Stewart - Power Railway Signalling

Some Observations on English and American Practice

Mr. F. Stewart (Member) A. S. T. C., A. M.I.E. (Aust.) Assoc. Inst. T.,

Signal Engineer, McKenzie & Holland (Aust.)

...

Size 1.07 MB
pdf6 1983 - Aug - Pratten - A Railway Passenger Information System

Jon RD Pratten BSc BE

Divisional Manager, GEC Digital, GEC Australia Limited

This paper covers the passenger information display system at Sydney Terminal (Central)

...

Size 247.46 KB
pdf7 1984 - March - Leclercq - South West Communications

G LeClercq

Westrail

The scope of the South West project was, in order of importance, to provide communications circuits for:-

  • the signalling train control
...

Size 577.61 KB
pdf8 1991 - March - Felstead - The Parrot and the Frog

Mark Felstead

Austrac Project Team

The title for this talk is some what misleading. The parrot is in fact a hand puppet and the frog is an oven glove.These are used to

...

Size 136.31 KB
pdf9 1995 - July - Davis - Open Discussion - Trusted Suppliers

Ken Davis

Recent cl.ianges to customer focussed orgaliisational structures has resulted in engineering, including railway signal and telecommuriications engineering, as being regarded

...

Size 34.48 KB
pdf10 1984 - Aug - Metcalfe - Low Cost CTC Alternative

AJ Metcalfe MIRSE

DML Engineering (QLD) Pty Ltd

in the intervening years between the two world wars C.T.C. systems were developed, basically as we know them today, giving all

...

Size 302.15 KB
pdf11 1986 - Nov - Carey - Melbourne Metropolitan Signal Systems Review

A.A. Carey

This paper describes the review carried out by the S & C Department to establish a criteria to rehabilitate the Metropolitan signalling system to a defined standard of

...

Size 1.76 MB
pdf12 1979 - July - Dawkins - Forrestfield Hump Yard

WH Dawkins

Westrail

The Forrestfield yard, opened in 1973 centralises the marshalling of loadings for country designations previously performed at Midland, East Perth, Perth

...

Size 1.57 MB
pdf13 1967 - Feb - McCauley - Level Crossing Protection in Victoria

DE McCauley MIRSE

In this paper I intend to outline very briefly the history of Level Crossing Protection in Victoria and to describe some of the control problems and principal

...

Size 1.29 MB
pdf14 1966 - Oct - Moore - Modern Developments in Semiconductor Rectifiers

JR Moore BSc, BE, AMIE Aust AMIEE

Resident Engineer (NSW) McKenzie & Holland (Australia)

The latest review published in the Proceedings of the Institution of Electrical

...

Size 1.8 MB
pdf15 2013 - March - Forbes - Solar Power for Railway Signalling and Communications

Michael Forbes B Tech (Elect) MIRSE MIE(Aust)

Australian Rail Track Corporation

This paper looks at how solar photovoltaic power systems work, design considerations for

...

Size 3.61 MB
pdf16 1982 - March - Sheldon - Communications Aspects of Metrol

R Sheldon SMIREE

Communication Section, VicRail

The Melbourne Metropolitan Train Control Centre (METROL) has been established to co-ordinate all signalling and communications

...

Size 2.62 MB
pdf17 1967 - Feb - Perry - Level Crossing Protection in NSW Railways

EC Perry AMIRSE

The State Government, recognising the increasing hazards to road users at level crossings diie to the day by day increase in the number of road vehicles, improvements to

...

Size 1.34 MB
pdf18 1987 - July - Braund - Adelaide Signalling Project - Power Supply System

A.S. Braund - JC- M.H.A. B.E. (Electronics), Grad I.E. Aust, Stud. IRSE

The power system for the Adelaide Resignalling Project has been designed for high availability ensuring that the

...

Size 74.55 KB
pdf19 1988 - July - Walsh - The Current QR Position Regarding ATC Installation

D. Walsh

Queensland Railways

Queensland Railways Officers have on a number of occasions in the past investigated available options which would enhance the present train

...

Size 415.67 KB