This paper provides a background and overview of the NTCS, outlines the key technologies that underpin the NTCS and describes the complexities, logistics, governance
This paper concludes the theme for Andy Knight’s year as president and in part provides a response to the first paper of his year “Equality, Diversity, and Inclusion: a
In this paper, we describe the optimised digital platform used for Testing and Commissioning (T&C) activities, which overcomes some common challenges arising
One of the key advantages that rail transportation has over its road-based competitors is that of driver efficiency. Typically a train will need less drivers to get from A to B for a given
The benefits in using standardised designs for signalling installations have long been recognised. As technology advances, so too have the methods and opportunities available to utilise these
This paper delivers a process of changing the signalling system of an operating railway (a brownfield resignalling project) whilst maintaining resilience during the difficult period of change
The November 2016 Kaikoura Earthquake was the largest disaster to ever strike New Zealand’s railway in terms of amount of damage. Large parts of the Main North Line (MNL) Railway were engulfed in
Applications of Global Navigation Satellite System (GNSS) in Railways are becoming more and more frequent. So far, the focus has been on non-safety related applications, such as passenger
With an aging signal asset and increasing capital works program the KiwiRail team have been pushed to increase deliveryand reduce timeframes. In order to meet the increased capital and renewals
The Victorian tram and train networks operate on a Franchise Model that includes both the operation and maintenance of the networks’ assets, with the contracts managed by Public Transport
Automatic Selective Door Operation system automatically determines the doors to enable at a given platform. It also triggers visual/audio announcements to inform passengers where doors remain
Urban Circus has had the opportunity to work alongside Metro Trains Melbourne and the Level Crossings Removal Projects on the signal sighting for the Carrum to Kananook Level Crossing Removal
Ballarat Line Upgrade (BLU) is the first project in the $1.75 billion dollar portfolio of Region Rail Revival program that will see upgrades to every regional passenger train line in Victoria.
The mode selection function allows switching between the operating modes of the High Capacity Metro Train (HCMT) for the Metro Tunnel Project (MTP) in Melbourne, i.e. conventional signalling and
Any change to an operational system in the railway industry is met with rigorously engineered safety controls – whether it be a signalling system or a power distribution system, a strong emphasis
A recent IRSE article discussed ‘why do signalling projects fail’ and provided valuable insights into what defines a failed project, as well as the inherent risks that contribute to this. It was
The evolution of digital technologies and information and communication technologies represents a great opportunity forrailway managers and operators to manage efficiently the railway
Assurance is increasingly being mandated for Australian rail projects as the means to satisfy ever-increasing governance requirements. The size and complexity of projects like Sydney Metro,