Technical Meeting Papers

Technical Meetings are held three times per year.
Papers are available here for download.
You must be logged in to be able to download content.


201503 – Baird – Victorian Signalling Principles

By: Robert Baird
Date Presented: March 20th, 2015


Read More...


201503 – Moore – Standards and the Signal Engineer

By: Trevor Moore
Date Presented: March 20th, 2015


Read More...


201503 – Simmons – Regional Rail Link TCS – The View of an Operator

By: Martin Simmons
Date Presented: March 20th, 2015


Read More...


201503 – George – 2.2 kV Three Phase Signalling Power Network for Regional Rail

By: Stephen George
Date Presented: March 20th, 2015


Read More...


201407 – Banerjee – Monologue of a Byte by Byte Traveller

By: Somnath Banerjee
Date Presented: July 25th, 2014


Read More...


201407 – Moore – Concept Signalling Plan – RIP

By: Trevor Moore
Date Presented: July 25th, 2014


Read More...


201407 – Hillcoat & Clancy – Increasing Capacity in the Hunter Valley Network – Streamlining Train Control

By: Brett Hillcoat & Michael Clancy
Date Presented: July 25th, 2014


Read More...


201407 – Naweed & Aitken – Drive a Mile in My Seat: Signal Design from a Systems Perspective

By: Anjum Naweed & John Aitken
Date Presented: July 25th, 2014


Read More...


201407 – Baker, Sundareswaran & Chan – Signalling Design for Passenger and Freight Railways – A Tutorial & Discussion Paper

By: Philip Baker, Kaniyur Sundareswaran & Trina Chan
Date Presented: July 25th, 2014


Read More...


201407 – Greaves & Allison – End of the Line for the Linewires at the End of the Line

By: Adam Greaves & Andrew Allison
Date Presented: July 25th, 2014


Read More...

Scroll to Top