Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 756

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 756
pdf0 2001 - Nov - Everist - Phoenix Train Control System

Geoff Everist BE(Elect) MIEAust AMIRSE

Business Development Manager - Systems Union Switch & Signal Pty Ltd

The US&S Phoenix Train Control System (TCS) is a typical example of

...

Size 619.93 KB
pdf1 2004 - March - Rottmann - Why Choose Axle Counter for Track Vacancy

Andreas Rottmann (MEng) Project Development Manager

Siemens Ltd Transportation Systems

In recent years axle counters have gradually replaced track circuits as the main method

...

Size 332.55 KB
pdf2 2009 - April - Hodson & Isles - ICE Design and Testing Acceptance

Grant Hodson BSc

Ben Isles BEng (Hons)

Base2 

The In Cab Equipment (ICE) for the Australian National Train Communications System (NTCS) implements the next 

...

Size 3.9 MB
pdf3 2006 - Nov - McDonald - Controlling The Alice Springs to Darwing Railway - A Case Study in Appropriate Technology

Wayne McDonald BE (Elec) FIRSE

Westinghouse Rail Systems Australia

The Alice Springs-Darwin Railway is the longest Australian rail construction undertaken in over 100 years.

...

Size 365.62 KB
pdf4 2013 - July - Nankervis - Managing Competency of Signalling Telecommunications Engineers and Maintainers

Phillip Nankervis Master of Professional Education and Training – Distance and Open Education

HRD Integrated Services

Rail signalling staff competency is critical to ensure

...

Size 131.17 KB
pdf5 1996 - July - Clark - You Can't Afford to Not Train But Can You Affo

Leon Clark TTrIC DipTechTch GradDipEdAdmin MEdSt

Training Consultant, 
Westinghouse Brake and Signal Company (Australia) Limited

Changing economic and workforce practices in

...

Size 374.97 KB
pdf6 2013 - March - How - IRSE Presidential Address

Francis How MA (Cantab) CEng FIRSE MIEE

IRSE President

As his term of office as IRSE President nears completion, Francis will reflect on the Centenary Year. He will consider

...

Size 1.95 MB
pdf7 2012 - March - Beavis & Keightly - Design Philosophy for Performance on the Melbourne Metro Rail Tunnel

Paul Charles Beavis BA BE(Hons) PhD MIEAust

Victorian Department of Transport

Gareth Keightley BEng(Hons)

Metro Trains Melbourne

Melbourne Metro is a

...

Size 445.46 KB
pdf8 2005 - Oct - Salson & Revell - Innovative System Application and Integration Engineering for Asia - Pacific

Howard Revell BA, FIRSE

Ansaldo Signal - Union Switch & Signal Pty Ltd Australia

Part 1: Innovative Systems Applications using Microlok II

Raphael Salson

...

Size 1.6 MB
pdf9 2011 - March - Wust and Hjort - Wheres The Train?

Derel Wust BE (Hons) MIE Aust, CPEng, GAICD

4TEL Pty Ltd

Graham Hjort BE (Hons), Grad Dip (Rail Sig)

4TEL Pty Ltd

GPS based technology is now common place

...

Size 424.61 KB
pdf10 2010 - March - Haskins - The Future Of Safety Systems Management: From Reactive to Proactive

Tom Haskins BSc Hons, PgDip, M.I.E.T, MSaRS, MCMI Australia

Parsons Brinckerhoff Pty Ltd

There is a challenge to be faced by railways: what is the future role of a safety

...

Size 59.51 KB
pdf11 1992 - March - Chin - The Effective Implementation of an Automatic Vehicle Monitoring System

DAvid T.F. Chin., ME, MACS.

Manager, Computer Engineering Services

The PTC started looking at AVM(Automatic Vehicle Monitoring) Systems as early as 1978 and conducted a pilot

...

Size 593.78 KB
pdf12 2005 - Aug - Lowe - Educating Engineers for Railway Traffic Coordination and Control

Ian Lowe BAppSc, DipEd, BE, GradDipMan, GradCerRiskMan

US&S Pty Ltd

The aim of this paper is to promote discussion regarding the ability of existing S&T organisations to adopt

...

Size 95.43 KB
pdf13 2009 - April - Hall - NTCS - National Train Communication System Project Overview

John Hall

Australian Rail Track Corporation

The primary purpose of the NTCS project is to provide a cost efficient, effective and interoperable Train Control  communications

...

Size 195.02 KB
pdf14 2006 - July - Warhurst & Keys - Epping - Chatswood Rail Link - Radio System

Peter Warhurst
John Keys

United Group Infrastructure

The aim of this paper is to highlight the unique aspects of the design and engineering required to implement radio

...

Size 81.27 KB
pdf15 2012 - March - Szacsvay and Moore - Broken Rails and the Survival of the Track Circuit

Paul Szacsvay FIRSE

Principal Engineer Signalling R & D

RailCorp NSW

Trevor Moore FIRSE

Signalling Standards Engineer

Australian Rail Track

...

Size 860.87 KB
pdf16 2015 - March - Yum amd Mahmood - Practical application of semiformal RAM methodology

Kai Yum BEng, BSc, GradDipSig&Comms

DEDJTR

Tariq Mahmood  BSc (Hons), MEng 

Advisian

This paper provides a review of the Reliability, Availability and

...

Size 245.45 KB
pdf17 2010 - July - Tan - Rapid Modernisation of Urban Passenger Rollingstock

Jason Tan Bach of Eng (Elec.), Bach of Com (Management, HRM)

Electrical Engineer (Public Transport Authority)

The availability of railcars and the ability to meet the growth

...

Size 310.8 KB
pdf18 1995 - March - Talbot - Safety & Quality for Railways

W. Talbot

Major rail operations safety incidents such as collisions can be reduced, using railway signalling technology, by controlling the speed and spacing of trains. This provides

...

Size 584.31 KB
pdf19 1987 - Nov - Clarke - Aberdeen - Werris Creek CTC - The Project

J.R. Clarke

S.R.A.

Although the obvious benefits of a C.T.C. type signalling system are well know, the documented, I feel it was with some misgivings that Executive of the

...

Size 333.36 KB