Technical Meeting Papers
Subcategories: 0
Files: 756
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content.
Only registered and logged in users can download files from this category.
Downloads: 756
Geoff Everist BE(Elect) MIEAust AMIRSE
Business Development Manager - Systems Union Switch & Signal Pty Ltd
The US&S Phoenix Train Control System (TCS) is a typical example of
...
Size
619.93 KB
Andreas Rottmann (MEng) Project Development Manager
Siemens Ltd Transportation Systems
In recent years axle counters have gradually replaced track circuits as the main method
...
Size
332.55 KB
Grant Hodson BSc
Ben Isles BEng (Hons)
Base2
The In Cab Equipment (ICE) for the Australian National Train Communications System (NTCS) implements the next
...
Size
3.9 MB
Wayne McDonald BE (Elec) FIRSE
Westinghouse Rail Systems Australia
The Alice Springs-Darwin Railway is the longest Australian rail construction undertaken in over 100 years.
...
Size
365.62 KB
Phillip Nankervis Master of Professional Education and Training – Distance and Open Education
HRD Integrated Services
Rail signalling staff competency is critical to ensure
...
Size
131.17 KB
Leon Clark TTrIC DipTechTch GradDipEdAdmin MEdSt
Training Consultant,
Westinghouse Brake and Signal Company (Australia) Limited
Changing economic and workforce practices in
...
Size
374.97 KB
Francis How MA (Cantab) CEng FIRSE MIEE
IRSE President
As his term of office as IRSE President nears completion, Francis will reflect on the Centenary Year. He will consider
...
Size
1.95 MB
Paul Charles Beavis BA BE(Hons) PhD MIEAust
Victorian Department of Transport
Gareth Keightley BEng(Hons)
Metro Trains Melbourne
Melbourne Metro is a
...
Size
445.46 KB
Howard Revell BA, FIRSE
Ansaldo Signal - Union Switch & Signal Pty Ltd Australia
Part 1: Innovative Systems Applications using Microlok II
Raphael Salson ...
Size
1.6 MB
Derel Wust BE (Hons) MIE Aust, CPEng, GAICD
4TEL Pty Ltd
Graham Hjort BE (Hons), Grad Dip (Rail Sig)
4TEL Pty Ltd
GPS based technology is now common place
...
Size
424.61 KB
Tom Haskins BSc Hons, PgDip, M.I.E.T, MSaRS, MCMI Australia
Parsons Brinckerhoff Pty Ltd
There is a challenge to be faced by railways: what is the future role of a safety
...
Size
59.51 KB
DAvid T.F. Chin., ME, MACS.
Manager, Computer Engineering Services
The PTC started looking at AVM(Automatic Vehicle Monitoring) Systems as early as 1978 and conducted a pilot
...
Size
593.78 KB
Ian Lowe BAppSc, DipEd, BE, GradDipMan, GradCerRiskMan
US&S Pty Ltd
The aim of this paper is to promote discussion regarding the ability of existing S&T organisations to adopt
...
Size
95.43 KB
John Hall
Australian Rail Track Corporation
The primary purpose of the NTCS project is to provide a cost efficient, effective and interoperable Train Control communications
...
Size
195.02 KB
Peter Warhurst John Keys
United Group Infrastructure
The aim of this paper is to highlight the unique aspects of the design and engineering required to implement radio
...
Size
81.27 KB
Paul Szacsvay FIRSE
Principal Engineer Signalling R & D
RailCorp NSW
Trevor Moore FIRSE
Signalling Standards Engineer
Australian Rail Track ...
Size
860.87 KB
Kai Yum BEng, BSc, GradDipSig&Comms
DEDJTR
Tariq Mahmood BSc (Hons), MEng
Advisian
This paper provides a review of the Reliability, Availability and
...
Size
245.45 KB
Jason Tan Bach of Eng (Elec.), Bach of Com (Management, HRM)
Electrical Engineer (Public Transport Authority)
The availability of railcars and the ability to meet the growth
...
Size
310.8 KB
W. Talbot
Major rail operations safety incidents such as collisions can be reduced, using railway signalling technology, by controlling the speed and spacing of trains. This provides
...
Size
584.31 KB
J.R. Clarke
S.R.A.
Although the obvious benefits of a C.T.C. type signalling system are well know, the documented, I feel it was with some misgivings that Executive of the
...
Size
333.36 KB