Technical Meeting Papers |
Subcategories: 0 |
Files: 756 |
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content. |
Only registered and logged in users can download files from this category.
Downloads: 756
L.Y. Lam MSc, CEng, MIEE, MIRSE, MIEAust
The Hong Kong Mass Transit Railway Corporation
The Mass Transit Railway employs a speed code fixed block signalling system which is a ...
|
|
Size |
436.83 KB |
Norm Grady Comp IRSE, FIE (Aust)
Manager, Network Planning & Development – Metro Trains Melbourne
The purpose of this paper is to recount the author's experiences in the ...
|
|
Size |
2.06 MB |
Len Neist Chief Executive ITSRR
Thank you for the invitation and opportunity to present a paper at your Annual General Meeting. One of the most significant safety risks that require ...
|
|
Size |
90.2 KB |
Choo Siew Aun Senior Manager, Signals
SMRT Trains Ltd. Singapore
Mike Harris Project Manager
Westinghouse Rail Systems Ltd. United Kingdom
Which comes ...
|
|
Size |
952.47 KB |
W.B. Johnston
Engineering Manager, Hawker Siddeley Rail Projects Ltd
It is unlikely for an electrified railway system with such diverse elements as traction, power supply, ...
|
|
Size |
412.68 KB |
Anjum Naweed BSc MSc PhD
Central Queensland University
John Aitken BE MIRSE SMIEEE
Aitken & Partners
Train drivers navigate conventionally designed ...
|
|
Size |
4.28 MB |
Frank Heibel PhD MSc (Hon) CPEng MIEAust FIRSE
Doc Frank Pty Ltd
The signalling systems of the metropolitan rail networks in the major Australian cities face their most ...
|
|
Size |
753.1 KB |
John T Skilton, CPEng, BE (Elect) Hons, MIRSE, MIPENZ, ONTRACK
James D Clendon, CPEng, BE (Elect) Hons, MIPENZ, Booz & Co.
By 2013 it is proposed that the Auckland ...
|
|
Size |
76.04 KB |
Victor G. Abbott, B.E. (Elec), Grad. Dip. Bus (Mat),
Project Engineer, KCRC ATP Project Leeds+Northrup Australia
This paper provides a technical overview of LeedscNorthrupls ...
|
|
Size |
915.23 KB |
Norm Grady FIE Aust. Comp IRSE
ALSTOM Melbourne Transport Limited
Melbourne's public transport operations were franchised to the private sector in 999 following a competitive ...
|
|
Size |
196.59 KB |
Les Brearley BE (Elect), Grad Dip Bus, FIRSE, MClT, RPEQ
Manager, Systems Safety and Quality Union Switch & Signal Pty Ltd
The change in industry snucture of the past decade ...
|
|
Size |
2.2 MB |
Brett Hillcoat G.C.Mgmt, Dip Bus Prog
Parsons Brinckerhoff
Michael Clancy B.Ed
Australian Rail Track Corporation
The Hunter Valley Rail Network is a mixed ...
|
|
Size |
1.16 MB |
Peter Winter Hon. Professor, Dr. Ing. ETH, CompIRSE
SBB Consulting, Berne Switzerland Director of ERTMS at UIC, Paris France
This report gives an update on the evolution of ...
|
|
Size |
2.33 MB |
Simon Bilston B Eng, MIEAust
Ansaldo STS Australia Pty Ltd (Formerly Union Switch & Signal)
This paper will discuss, as a case study, the design development for the ...
|
|
Size |
2.04 MB |
Hugh Hunter MSc MBCS MIRSE Senior Consultant
Frazer-Nash Consultancy
We often read press statements slating a range of engineering projects for wasting taxpayer money. These ...
|
|
Size |
1.62 MB |
P. J. Gavan
Manager, Communications V/Line
When the train radio communiations service requirements were examined it was shown that they formed two distinct groups. There was a ...
|
|
Size |
837.51 KB |
Charles R Page Manager, Marketing & Sales
Invensys Rail System Australia Westinghouse Signals Australia Division
This paper describes the first Australian application of ...
|
|
Size |
568.47 KB |
Geoff Meers, B. Surv, D.U.R.P. M. Sc, MIS (Aust)
Manager (Road Use Data Analysis) Queensland Transport
Road safety outcomes in Queensland and across Australia have improved ...
|
|
Size |
1.87 MB |
Andrew Kitto BEng Elect (Uni of SA)
Australian Rail Track Corporation (ARTC)
Australian Rail Track Corporation is the owner and manager of the interstate rail track on behalf ...
|
|
Size |
1.94 MB |
Mr Brett Baker BE MBA MIRSE
Project Manager Connex New Rolling Stock Project
The approach adopted to the procurement of the New Rolling Stock for the Connex Network in ...
|
|
Size |
304.49 KB |