Technical Meeting Papers |
Subcategories: 0 |
Files: 756 |
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content. |
Only registered and logged in users can download files from this category.
Downloads: 756
PN Dean MIRSE
Westrail
In 1950 the majority of the Westrail system was single line, operated under the rules applicable to the Train Electric Staff System or the Train Staff ...
|
|
Size |
1.38 MB |
Andrew Blakeley-Smith BSc (Hons) MIEAust MIRSE
Andrew Blakeley-Smith & Associates
Railway signalling technology has evolved over the years from the primary discipline of the ...
|
|
Size |
484.23 KB |
Paul Furniss BEng (Hons) CEng MIET
Australian Rail Track Corporation
The In Cab Activated Points System is a system which provides the Train Crews with a window of opportunity ...
|
|
Size |
654.21 KB |
Mr. Rodrigo Alvarez MEng CEng MIET
Titan ICT Consultants
Mr. Juan Roman MEng
Titan ICT Consultants
A general trend in modern Train Control Systems is the ...
|
|
Size |
896.48 KB |
Dwayne Allan B Eng (Hons), PGradCert (Railway Signalling), AMIRSE, MIEAust, CPEng
Siemens Ltd.
Distributed control systems have their heritage in manufacturing, process or ...
|
|
Size |
5.03 MB |
Peter Symons, F.I.R.S.E.
Manager N.S.W. Operations Westinghouse Brake Rr. Signal Co. (Aust.) Ltd.
Tony Vaz, F.I.R.S.E.
Project Manager Signal Renewal Rr....
|
|
Size |
714.53 KB |
Noel Burton BSc MIRSE
Westinghouse Rail Systems Australia
The title of this technical paper may be a little misleading but like all good attention grabbing headlines has at ...
|
|
Size |
18.21 MB |
Daryl Byrne Director Public Transport Safety
Department of Infrastructure
Since the early 1970's there have been numerous strategies and studies conducted by both government ...
|
|
Size |
213.48 KB |
Anthony Godber BSc(Eng), CEng, MIEE, MIRSE
Pilbara Rail Company
2001, the integration of the Hamersley Iron and Robe River railways was announced. These two railways became ...
|
|
Size |
118.98 KB |
D. A. Norris B.E. (ELEC) M.I.R.S.E.
Manager - Research and Development ABB Signal Pty Ltd.
This paper focus on the reasons why, some of the development processes used, and ...
|
|
Size |
479.31 KB |
Chris Long MBA, B.Eng, Grad Dip IT
QR
Despite widespread awareness of risk management techniques, there are frequently difficulties in turning that knowledge into safer ...
|
|
Size |
175.27 KB |
Chris Miller
GEC Alsthom Australia
The introduction of City Rail's widely advertised 1996 Timetable, was dependent on the Granville Area Resignalling Y-Link project being ...
|
|
Size |
1.31 MB |
Mike Wheals
Manager, Railway Systems GEC Digital
In February 1984, GEC Railway Signals received an order from the State Rail Authority of NSW for the re-signalling of the ...
|
|
Size |
511.72 KB |
Stephen McClary BSc (Hons) CEng MIEE MIRSE
Head of Engineering Invensys Rail Systems Australia Westinghouse Signals Australia Division
The Regional Fast Rail project has given ...
|
|
Size |
679.25 KB |
Phil Hingley, C.Eng., M.I.E.E., M.I.R.S.E.
(GHD - Transmark)
This paper desaibes British Rail's current padice in Centralised Control Systems. It outlines the business needs ...
|
|
Size |
735.05 KB |
P. Gartner MIRSE
Rail Engineering Group, Signals & Communication Engineering
An important concept of the Melbourne Underground Rail Loop was to overcomebthe turn-around ...
|
|
Size |
828.71 KB |
Peter McGregor BEng (Elect) Grad Dip Sys Eng FIRSE
Lead Engineer Signals and Control Systems
Asset Standards Authority, TfNSW
Stephen Lemon MSc,Rail Systems Engineering...
|
|
Size |
541.55 KB |
Robert Tapsall MlRsE
General Manager Information Solutions ALSTOM Australia - Transport
For a number of years the development of the European Rail Traffic Management System ...
|
|
Size |
5.39 MB |