Technical Meeting Papers
Subcategories: 0
Files: 756
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content.
Only registered and logged in users can download files from this category.
Downloads: 756
Richard Stepniewski NSW State Manager for Signalling, Electrification & Communications
ALSTOM Australia - Transport
was successfully commissioned at Blacktown, in two stages
...
Size
1.15 MB
Tony Godber CEng, BSc(Eng) MIET, MIRSE
Rio Tinto
To perform its safety critical functions, a signalling system for a rail network needs to have timely information on the
...
Size
143.42 KB
Graeme Stainlay B.Sc, BE (Elec) (Hons)
David Glendinning BE (Elec) (Hons), Post.Grad. Dip. RailSig
Rail Corporation New South Wales
Rail Corporation New South Wales
...
Size
481.99 KB
Peter Symons FIRSE General Manager
Bombardier Transportation (Signal) Australia Pty. Ltd.
This paper on Australasian Signalling is an introduction to whet the appetite for
...
Size
306.21 KB
D . J . Ness, MIEAust MIRSE
Connell Wagner(Vic)
From 1985 to the present, the State Railway of Thailand (SRT) has embarked upon a series of major re-signalling schemes which
...
Size
2.77 MB
Jeff Russell
Signalling and Power Installation Manager John Holland Rail
John Cilia
Project Manager CPPM MAIPM AMIRSE UGL Limited
In the past two years,
...
Size
2.19 MB
Henry van Ginkel FIE Aust
Opus Rail Pty Ltd
Track design and track maintenance, similar to signalling design and signalling maintenance have evolved over the years and go hand
...
Size
1.15 MB
Ray Hancox S.T.A.
In December 1981 , the Austral i an Rai lways Union received a copy of a report produced by the John Connel l Group. The report contained recomnendations regarding an
...
Size
53.51 KB
Wayne McDonald, B.E. (Elec). MlRSE
Manager, Research & Development, Signal Division, Westinghouse Brake & Signal Co. (Aust.) Ltd.
This paper traces the development of a
...
Size
507.77 KB
George Nikandros BE CPEng RPEQ FIRSE MIEAust MACS
QR Limited
QR has had some 20 years operational experience with ATP with some 2500 route kilometres equipped, including some
...
Size
1.85 MB
Andrew Blakeley-Smith, BSc(Hons), MIEAust, MIRSE
Director Andrew Blakeley-Smith & Associates
Allan Neilson, BE(Elect), MIPENZ, FIRSE
Manager Traction & Electrical ...
Size
145.84 KB
John Webb BE (Elec), MIEAust
COMMSIG
Telecommunications companies have been using Optical Fibre for many years. So why did it take those of us in the Railway community in
...
Size
409.63 KB
Raymond Lowe BEng (Elec) (Hons), AMIRSE, MIEAust, MIE
Senior Engineer, Rail Systems ARUP
The Cambrian Line re-signalling project is the first UK implementation of the European
...
Size
1.18 MB
Tony Simes - TransAdelaide
Alistair Morrison - ALSTOM Australia
This paper presents the following key topics for the TransAdelaide Control system replacement process:
...
Size
4.66 MB
M. Oldfield
Manager Planning & Research Freight Group Queensland Railways
In July 1991, the old Railways Act was abolished and a new act, the Transport Infrastructure
...
Size
265.91 KB
John Aitken BE AMIRSE
Aitken & Partners, Consulting Engineers
In October 1877 Bell published construction details of his telephone invention. A NSW Railway engineer, Mr
...
Size
1.99 MB
M. Williams
Westinghouse Signals Limited
Solid State Interlockings (SSI) is a microprocessor based system, designed for use in railway signalling installations to compute and
...
Size
469.62 KB
Richard Shenton MIRSE
Reliable Data Systems
Since commercial railways began around 200 years ago, passing trains have been detected from the trackside. Now we have entered the
...
Size
3.36 MB
Peter Burns MBA BAppSci CPEng MIEAust MIRSE
PYB Consulting Pty Ltd
RAMS analysis and the setting of RAMS requirements (often expressed as single indices) are becoming common
...
Size
422.38 KB
Graham Hjort BE(Hons), Grad Dip (Rail Sig)
4Tel Pty Ltd
Operation and maintenance of the Country Regional Network (CRN) was transferred to John Holland on 15 January 2012,
...
Size
569.64 KB