Technical Meeting Papers |
Subcategories: 0 |
Files: 756 |
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content. |
Only registered and logged in users can download files from this category.
Downloads: 756
Thavorn Ratanavaraha, B.Eng. FIRSE, FICE (Thailand)
Director of the Signalling and Telecommunications Department State Railway of Thailand
|
|
Size |
96.25 KB |
Lionel Portela B.E (Elec.) Project Engineer TVS,
ALSTOM Australia – Transport
Enhancing train visibility in Dark Territories in the NSW metropolitan rail network has occurred ...
|
|
Size |
697.51 KB |
Marc Chadwick BE, GradDipMgt, MIRSE
Manager, Product Development, Westinghouse Signals Australia
Industry and its customers are jointly seeking lower costs, faster delivery, ...
|
|
Size |
704.49 KB |
Don Weerakody MIRSE, MIEAust, MIET
Public Transport Authority
This paper outlines two signalling projects recently undertaken by the Public Transport Authority of Western ...
|
|
Size |
141.04 KB |
Phillip Barker, MIRO, Dip TSI.
Senior Transport Safety Investigator Australian Transport Safety Bureau
A greater understanding of safety related occurrences can ...
|
|
Size |
427.49 KB |
Alex Borodin BEng (Microelectronics)
Safety and Environment QR
This paper broadly discusses the SPAD Management programme in QR.
|
|
Size |
1.64 MB |
Robert Tapsall, Construction Manager Trackstar Alliance, MIRSE
With great vision, QR embarked on their first Program Alliance to gain long term support and commitment from the rail ...
|
|
Size |
745.6 KB |
John Gifford FIRSE
ARTC Hunter Valley
Thomas McPeake AMIRSE
ORAH Rail
ARTC's Hunter Valley Rail Network in NSW is currently transporting 150MTPA of coal to ...
|
|
Size |
677.01 KB |
Adam Morris BE(Hons), Dip PM, MIEAust, MAIPM
Abigroup Contractors
When considering railway signalling, track or structures, it is important to consider that each of these are ...
|
|
Size |
229.28 KB |
Richard Colley Chief Engineer
Open Access Pty. Ltd.
|
|
Size |
516.56 KB |
Written by A.Baayens Technical Officer
Union Switch & Signa
Heavy Haul Railways are often owned and operated by bulk commodity producers. Their rail operators are focused ...
|
|
Size |
56.95 KB |
Yang-Lit Phay BEng(EE), GradIEAust, MIEEE
Signals Engineer, Public Transport Authority of Western Australia
Changes in regulations by the Australian Government in the use of ...
|
|
Size |
329.35 KB |
J.Keogh
Manager Operations Research Queensland Railways
Following over twelve months of investigation and negotiation Driver Only Operation was introduced into Queensland ...
|
|
Size |
755.35 KB |
Warwick Allison
Principal Design Engineer, Signals, Rail Infrastructure Corporation
The Botany Line is a predominantly single track railway with a junction from the goods ...
|
|
Size |
555.29 KB |
Graeme Ackland B. AppSci (Elect)
FIRSE ALSTOM AUSTRALIA
The purpose of this paper is to examine the tools available to the Commissioning Engineer to achieve successful ...
|
|
Size |
397.4 KB |
Keith Lugsden, B.Eng., M.I.E.E.E.
Software Team Leader, Safety Sr Communications International Railroad Systems Pty Ltd Adelaide, South Australia
This paper describes the ...
|
|
Size |
477.74 KB |
Simeon Cox MIET AMIRSE
Parsons Brinckerhoff Australia Pty Ltd
Axle counters have many advantages as a train detection system but in comparison with track circuits they are ...
|
|
Size |
598.29 KB |
Lyle Jackson Managing Director
Union Switch & Signal Pty Ltd
Understanding and meeting the operators needs in a rapidly changing industry environment is a major challenge for ...
|
|
Size |
176.74 KB |