Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 756

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 756
pdf0 1992 - July - Davis & Crossley - Driver Assistance Video System

Ken Davis, FIRSE, MIEAust, MIEE

Director - Connell Wagner

Peter Crossley

Associate - Connell Wagner

This paper describes the application of a Driver

...

Size 747.9 KB
pdf1 2004 - July - Jones - Kuala Lumpur Monorail

Peter Jones (AMIRSE)

The intent of this Paper is to provide a background and broad overview of the Kuala Lumpur Monorail System particularly for those who are not familiar with the

...

Size 295.42 KB
pdf2 1996 - July - Bladon & Beck - Monitoring Rolling Stock Wheel Condition

Keith Bladon & Philip Beck

Teknis Electronics

This paper reviews wheel condition monitoring technologies and presents the Teknis Wheel Condition Monitoring System. The design

...

Size 3.61 MB
pdf3 2008 - July - Automated Signalling Design - A Feasibility Study

Aaron Fraser BSc, BEng, Post.Grad.Dip RailSig, S.I.R.S.E.

Ansaldo STS

This paper documents the proposed development of new automated signalling design tools to facilitate

...

Size 237.34 KB
pdf4 1984 - Nov - Selfe - Australian National Dry Creek - Crystal Brook CTC

KC Selfe

Chief Engineer, Teknis Systems Division, Teknis Consolidated Pty Ltd

The Dry Creek - Port Pirie C.T.C. System controls the section of the Australian National Northern

...

Size 420.06 KB
pdf5 1998 - July - Cockram - Keynote Address - Down the Privatisation Road

FC Cockram Corporate Relations Manager

Tranz Rail Ltd

 



Size 322.38 KB
pdf6 1984 - March - Hamersley Iron - Railway Signals & Communications Departme



Size 718.57 KB
pdf7 1998 - March - Fullerton - AWARE - Australia Wide Augmented Radio Environment

John Fullerton Chief Operating Officer

National Rail Corporation Ltd

 



Size 270.07 KB
pdf8 1994 - Aug - Knowlton - 4 Microloks Plus a Triangle

Peter Knowlton FlRSE

General Manager Signalling Ventura Projects

 



Size 854.95 KB
pdf9 2007 - March - Page - Windah - Grantleigh - Coal Line Capacity Improvements

Charles Page BSc. Elec/Electron, MBA, FIRSE

Director of Marketing & Sales Westinghouse Rail Systems Australia

The Windah-Grantleigh project arose out of Queensland Rail's

...

Size 865.78 KB
pdf10 2009 - Nov - Thompson - Implemenating Metro Signalling Systems to Conventional Urban Railways

Nick Thompson Signalling Operations Manager

Invensys Rail

This paper is attempting to answer the question of how to move towards a "Metro" style of rail operation, from the

...

Size 3.96 MB
pdf11 1986 - Aug - Luber - ZUB100 Automatic Train Control (ATC) System

Brian Luber

Since railways were established, many systems have been developed to ensure a safe and economic rail service. A signalling system which has played a major role here is that

...

Size 464.47 KB
pdf12 1997 - Nov - Wurst - Control Centres

Derel Wust Senior Asset Manager, Network Systems

Rail Access Corporation

 



Size 556.97 KB
pdf13 2004 - March - Lowney - Craigieburn Rail Project



Size 708.02 KB
pdf14 2015 - March - George - 2.2 kV Three Phase Signalling Power Network for Regional Rail

Stephen George Dip Eng, FIEAust, CPEng

OPUS Rail

The signalling power distribution network for the Victorian Regional Rail Link project is provided in two distinct ways, from

...

Size 1.27 MB
pdf15 2003 - July - Crompton and Ingleton - West Angelas Rail Project

Damian Crompton

Union Switch & Signal Pty Ltd

Brian Ingleton

Fluor Australia

This technical paper discusses the modifications to the signalling system to

...

Size 1.08 MB
pdf16 2013 - Oct - Topham - The International Engineering Safety Management Guidance

Gareth Topham C Eng, B Eng, MSc, MIRSE, MIET, MSaRS

Rio Tinto

Decisions on rail safety are traditionally based on established practice and experienced judgment, supported by

...

Size 275.76 KB
pdf17 2012 - July - Blaauboer - SIL 4 Interlocking based on COTS hardware

Michiel Blaauboer MSc Technical Manager

Movares

Nowadays, the majority of proprietary electronic interlocking systems are built with dedicated hardware. The interlocking

...

Size 3.25 MB
pdf18 1987 - March - Williams - Electrification of New Zealand Railways - North Island Main Trunk - The Project Management Organisation

A.G. Williams

Director of Electrification, New Zealand Railways Corporation

In December 1981 the New Zealand Governtnent approved the New Zealand Railways Corporation

...

Size 527.27 KB
pdf19 2010 - June - Scott - Where are we going with Point Indicators

David Scott BSc. Elec Eng., C.Eng., M.I.E.T., F.I.R.S.E.

Senior Signal Engineer – Lead, Calibre Rail

The rapid growth in the Western Australian iron ore industry during the

...

Size 0