Technical Meeting Papers
Subcategories: 0
Files: 756
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content.
Only registered and logged in users can download files from this category.
Downloads: 756
A.U. Wishnia
A. Dip. EE.
The 64 seater Glenelg trams have conveyed people over the 11 kilometres of track between Adelaide and the seaside resort of Glenelg for over half a
...
Size
402.31 KB
C. L. TURNER. B.ENG. MlRSC MIE AUST
Manager Communlcat ions Perth Urban Rail Electrif lcation Project
One of the more important issues that a transport organisation must
...
Size
277.51 KB
GREGORY W.R. ROYLE
Manager Trusted Systems Computer Sciences of Australia Pty Ltd
Safety Auditing is an engineering activity which has arisen from requirements for the
...
Size
240.49 KB
Eugene Broderick GradDipRailSig AMIRSE
Laing O’Rourke Australia
Stephen Lemon MSc MIEAust CPEng RPEQ MIRSE
Laing O’Rourke Australia
The Docklands Light
...
Size
1.75 MB
D CORRIE CEng FlEE FlRSE
First Presented at the IEE, Savoy Place, London
Look ahead some 25 years: what do you think railways will be like? Recently, many railways have been
...
Size
1.04 MB
Richard M Robinson, BE BA FIEAust MSFPE
Director, R2A Pty Ltd
statutory, regulatory and common law obligations have been met. It is primarily a demonstration that all sensible
...
Size
392.29 KB
Stuart Mclean Bachelor Electronic Engineering, Hons (RMIT)
United Group Infrastructure Ltd
The MetWest Alliance project involved the upgrade of the signalling, track and
...
Size
1.11 MB
Paul Eyre Project Manager
Ansaldo STS / Union Switch & Signal Pty Ltd
The 71 km extension of the Perth electrified rail network from Perth through to Mandurah, commonly
...
Size
95.42 KB
G P Nikandros FIRSE
Safety is fundamental to a railway business. Railway signalling and telecommunications are very important elements in the systems used for the safe working of trains
...
Size
277.22 KB
ILTIS is a traffic-management system (TMS) which integrates all the essential functions required for the management of a railway network. Its main focus is to simplify all aspects of railway
...
Size
557.18 KB
Klaus Mindel Dr.-Ing.
Thales Rail Signalling Solutions
ETCS Level 2 is developed as a European standard and several projects are already in operation, mainly on a national
...
Size
241.59 KB
Andrew Blakeley-Smith MIRSE
Systems Consultant Teknis International Railroad Systems
"Signalling" to the average communications engineer normally means the process by means of
...
Size
415.39 KB
Robert E Piper, REA, MIRSE, ONTRACK Ken K Ashman, AMIRSE, ONTRACK Myles A Radford, ONTRACK
The Auckland Electrification Project (AEP) and Develop Auckland Rail Transport
...
Size
89.68 KB
R. Baird B.E. M.I.R.S.E.
Project Manager, Public Transport Corporation Victoria
The rationalisation of signalling and trackwork in the Victorian country rail network is an
...
Size
349.03 KB
Brenton Atchison BSc (Hons), PhD
Siemens Rail Automation
Dirk Klokman BE, MBA
Siemens Rail Automation
David Baker DipPM
TasRail This paper ...
Size
860.21 KB
N. Wallace
The first Railway Signalling & Telecommunications Course was promoted by the signalling sector of the Rail Industry Association of Great Britain ...
Size
1.57 MB
G.R. Pallister
Project Manager, Westinghouse Brake & Signal Co. (Australia) Ltd.
The Signalling Project is composed of two separate contracts, Stage One and Stage Two. The
...
Size
598.05 KB
AEC Neilson BE (Elect), MIPENZ, FIRSE
Manager STE Engineering Tranz Rail Ltd
New Zealand's railways have a history of signalling innovation and change. Double line and single
...
Size
791.16 KB
Luke Smith, A.D. Cart., A.D. CE., P.G. Dip GIS.
Member Permanent Way Institute Qld. Spatial & Information Solutions Division, Technical Services Group, QR.
Typical
...
Size
335.88 KB
Alexander Badger BE (Hons) EE, Shubroto Bhattacharjee B Tech (Hons) EE, DMM, MIEAust Darko Musicki PhD
Engineering Design Group, Tyco Integrated Systems Rydalmere NSW ...
Size
629.91 KB