Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 756

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 756
pdf0 2003 - November - Lyons - Resignalling the NSW Country Network

Mark Lyons

Rail Infrastructure Corporation

The NSW country network is a patchwork of signalling systems built between 1900 and 2000. This mix of signalling systems and the age

...

Size 686.02 KB
pdf1 1994 - March - Moore, Topfer & Dwyer - CityRail Control Centre for the State Rail Authority, NSW

Mr T. G. Moore, Train Control Systems Manager

CityRail Signal Renewal and Modernisation Programme

PART A - CONTROL CENTRE ARCHITECTURE AND FUNCTlOlN

Mr A. Topfer,

...

Size 757.21 KB
pdf2 1996 - March - Baker & Oberkramer - BHPI0 : Improving Safety & Efficiency with Automatic Train Protection (ATP)

Brett Baker, B.E. (Elec), MBA,

Project Leadr - ATP, BHP Iron Ore

Bill Oberkramer, B.E.,

Systems Engineer, Harmon Industries

The main aims of the railroad

...

Size 602.42 KB
pdf3 1988 - Nov - Davis - An Overview of the Adelaide Metropolitan Signalling Project

K.A. Davis FIRSE, MIEE MEAUST, MACEA

Connell Group

This paper describes some o f the history and events prior to the implementation o f the Adelaide, signalling project, the

...

Size 502.14 KB
pdf4 2003 - March - Aitken - Australia Wide Communications System for Railway Operators

John Aitken BE MlEEE AMIRSE

Aitken & Partners

Australia has a sad history of incompatibility in railway radio communications. There is no standard for radio communications on

...

Size 10.73 MB
pdf5 1991 - Nov - Barber - Kuraby - Beenleigh Duplication & Acacia Ridge Freight Terminal Project For Queensland Rail

John Barber

Project Manager EB Signals Pty. Ltd.

In September, 1990, Queensland Rail awarded a contract to EB Signals for resipalling works associated with duplication of

...

Size 522.99 KB
pdf6 1986 - Aug - Howker - Trivial Pursuit & Brief History of Automatic Train Control (ATC)

A.C. Howker

The use of the term "Automatic Train Control" (A.T.C.) was, by definition, wrongly named! It was neither truly automatic nor did it totally control trains. However in the

...

Size 708.8 KB
pdf7 2006 - March - Traynor - Safe Platforms for the Integrated Control of Railways

Owen Traynor Technical Director,

Westinghouse Rail Systems Australia

Much of the material upon which the following discussions and descriptions are based has been produced and

...

Size 80.36 KB
pdf8 2013 - March - Baker - Keeping your eyes on the road

Philip Baker MIRSE

Aurecon Australia Pty Ltd

This paper will examine the challenges for signalling designers that follow from the move of signalling and control systems from

...

Size 1.47 MB
pdf9 1989 - July - Byron - State Rail Data Network

JEFF BYRON, M. ENG. SC., B. E.

COMMUNICATIONS ENGINEER

Digital transmission of information for NSW Railways purposes dates back at least to 1857 when the NSW Electric

...

Size 190.51 KB
pdf10 1997 - March - Zhang - Simulink Models for Track Circuit System in Railway Signalling System

Dr. Jack Zhang Centre for Railway Engineering

Central Queensland University

The paper presents a Matlab/Simulink based simulator for tract circuit in railway signalling

...

Size 370.49 KB
pdf11 2005 - March - Dalton - Redeveloping the Sydney Network

David Dalton BE (Civil), MBA

Transport lnfrastructure Development Corporation

The Transport lnfrastructure Development Corporation will deliver projects which will

...

Size 720.64 KB
pdf12 2014 - March - Heibel - Passenger Benefits from Automatic Train Control

Dr Frank Heibel
PhD MSc (Hon) MIEAust CPEng FIRSE

Doc Frank Pty Ltd

Travelling by train in a major Australian city has become an increasingly challenging experience. The

...

Size 342.34 KB
pdf13 1998 - March - Shuard - National Rail

Max Shuard CPEng, B. Bus (Transport) M.I.E. Aust, M.C.I.T.

National Rail Corporation Ltd.

The delivery of the 120 NR class locomotives to National Rail has been the largest

...

Size 404.58 KB
pdf14 2008 - March - Howker & Burton The Application of European ATP to Existing Signalling

Anthony C. Howker (Past President)

Noel J. Burton (WRSA)

HonFIRSE & AMIRSE

The first part of the paper describes the basic principles of European Automatic Train

...

Size 507.74 KB
pdf15 2007 - Oct - Murphy - The Application of ERTMS/ETCS System

Eddie Murphy HND Engineering, MIRSE

Westinghouse Rail Systems Australia

It is timely to provide an update about ERTMS/ETCS given that there is a trial application currently in

...

Size 973.94 KB
pdf16 1990 - Apr - Aitken - Does Centralised Control Mean Centralised Communications or Did Murphy Err?

John Aitken BE, MIEEE, AMIRSE

Director Aitken & Partners Consulting Engineers

The Sydney North Shore Times recently related a tale which should bring a chill to the spine of

...

Size 269.48 KB
pdf17 2003 - November - Coleman, Turner, Li and Hamilton - Driver Recognition of Railway Signals

Nick Coleman, Claire Turner, Guangyan Li and W. Ian Hamilton

Human Engineering (Australia) Pty Ltd Human Engineering Ltd (UK)

The role of human factors in understanding and

...

Size 130.72 KB
pdf18 1986 - Nov - de Visser - MetRail - Integrated Services Digital Network (ISDN)

P. de Visser

Rail Engineering Group, Signals & Communication Engineer

The high operating costs, the unreliability and the lack of expansion capacity of the MetRail

...

Size 378.71 KB
pdf19 2000 - July - Ursich - Fit for Purpose - Signalling Solutions with Processor Based Interlockings

John Ursich

Control and Communications Systems Manager, Westrail

Westrail has embarked on a signalling and communications modernisation program for its key Freight Services

...

Size 256.05 KB