Technical Meeting Papers |
Subcategories: 0 |
Files: 756 |
Technical Meeting Papers
Technical Meetings are held three times per year. Papers are available here for download. You must be logged in to be able to download content. |
Only registered and logged in users can download files from this category.
Downloads: 756
Marc Chadwick (MTRE, BE elec, Grad Dip Bus)
Project Manager Westinghouse Brake and Signal Company (Australia) Limited
This paper describes the development of a Centralised ...
|
|
Size |
820.22 KB |
Geoff Everist BE(Elect) MIEAust AMIRSE
Business Development Manager - Systems Union Switch & Signal Pty Ltd
The US&S Phoenix Train Control System (TCS) is a typical example of ...
|
|
Size |
310.24 KB |
Naomi Frauenfelder
TrackSAFE Foundation Manager
trackSAFE is a not for profit foundation, established by the Australian rail industry in 2012.
trackSAFE aims to reduce ...
|
|
Size |
1.19 MB |
Paul Szacsvay B.E. (Elec) M. Admin. MlRSE MIE(Aust)
Principal Signalling Engineer Rail Infrastructure Corporation of NSW
It took two decades from the introduction of LED ...
|
|
Size |
380.29 KB |
John Aitken BE MIRSE SMIEEE
Aitken & Partners
“New rolling stock or electrical/electronic equipment to be used in rolling stock modifications must be designed, built and ...
|
|
Size |
3.33 MB |
Peter Symons F.I.R.S.E.
Engineering and Design Manager, Novo Rail
Most safety management activities for say, signalling and control systems concentrate on measuring ...
|
|
Size |
418.4 KB |
Tony Simes B.Eng (Elec), MIEAust, CPEng
Australian Transport Safety Bureau
The responsibility for rail safety regulation in Australia lies with each State or Territory. Each ...
|
|
Size |
649.36 KB |
Victor G. Abbott B.E (Elec), M.B.A (Tech Mgt), MlRSE
Project Manager, Foxboro Transportation, Invensys Rail Systems
Today's railway control systems provide a spectrum of ...
|
|
Size |
3.3 MB |
Martin Simmons
Simmons Rail Consultants
The Regional Rail Link (RRL) Project required the introduction of a new V/Line Train Control System (TCS) to control the signalling in ...
|
|
Size |
203.79 KB |
Andrew Blakeley-Smith BSc(hons), MIRSE MIEAust
The Kuala Lumpur metre gauge suburban rail system is being double tracked and electrified at 25kV. The railway authority, KTMB, required ...
|
|
Size |
2.84 MB |
Dejan N. Lutovac MSc. Electronics, MIRSE
Senior Signal Design Engineer
Connell Wagner
Railway Signalling Division
This paper gives a summary of possible ...
|
|
Size |
1.18 MB |
P.N. Scottney-Turbill
Train Services Superintendent State Transport Authority South Australia
Following the State Transport Authority's acceptance of its Consultant's ...
|
|
Size |
112.87 KB |
Kaniyur Sundareswaran M.S., FIRSE, CEng., FIETE, MIEAust, CPEng.,
Aurecon (NovoRail Alliance)
Sulphide Junction Signalling System was successfully commissioned on 27th ...
|
|
Size |
730.63 KB |
Pierre-Henri Marillet
Scott Lister Pty Ltd.
Francois Pignard
Scott Lister Pty Ltd.
Luke Lee MRailSig BE AMIRSE MIEAust
Scott...
|
|
Size |
906.38 KB |
Ray Kinnear Director, Public Transport Policy & Planning
In Summary, this is a huge step forward for public transport in Victoria :
• More than 24,000 more services every week ...
|
|
Size |
1.28 MB |
David Ness
Kinhill Connell Wagner
Joint Venture
National Rail Corporation was formed in 1992 under the auspices of the Federal Governments One Nation Programme. In ...
|
|
Size |
797.95 KB |
Jim Warwick
Signal Maintenance CO Ordinator Thiess lnfraco
On the 2gth August 1999 the Victorian public transport system was privatised.
...
|
|
Size |
288.93 KB |
George Erdos
Chairman IRSE Australasian Section Licensing Sub Committee
This paper builds on recent events in the rail industry both in Australia & the UK and explains the ...
|
|
Size |
807.57 KB |
Trevor Moore B.E. (Elec), MBA, FIRSE, FIE(Aust)
Director Endeavour Management & Engineering Pty Ltd Project Director TOMS, State Rail Authority IT & T
The CityRail Division of ...
|
|
Size |
268.61 KB |
Michael Ingwersen Institute of Engineers
Railway Technical Society Bachelor of Engineering, Mechanical Knorr Brakc Australia Pty Limited
Railway brake technology has changed ...
|
|
Size |
440.52 KB |