Technical Meeting Papers

Technical Meetings are held three times per year.
Papers are available here for download.
You must be logged in to be able to download content.


196702 – McCauley – Level Crossing Protection in Victoria

By: DE McCauley
Date Presented: February 17th, 1967

DE McCauley MIRSEIn this paper I intend to outline very


Read More...


196610 – Moore – Modern Developments in Semiconductor Rectifiers

By: JR Moore
Date Presented: October 14th, 1966

JR Moore BSc, BE, AMIE Aust AMIEEResident Engineer (NSW


Read More...


196507 – Evans & Pitkeathly – Signalling on the Mt Isa Railway Rehabilitation Project

By: Evans & Pitkeathly
Date Presented: July 17th, 1965


Read More...


196607 – Adamson – Modern Trends in Railway Signalling

By: WJ Adamson
Date Presented: July 17th, 1966

WJ Adamson AMIRSEIn recent years, the importance of a m


Read More...


196603 – Irving – Signalling Associated with Three Track Operation Between Hawthorn and East Camberwell and the Route Setting Control Panel at Camberwell

By: AG Irving
Date Presented: March 18th, 1966


Read More...


196510 – Rees – Reconstruction of Communications Pole Line

By: J Rees
Date Presented: October 29th, 1965


Read More...


195810 – Wooley, Irving & Clayton – Installation of CTC Signalling: Eastmalvern to Glen Waverley

By: Wooley, Irving & Clayton
Date Presented: October 29th, 1958


Read More...


195408 – Black – Signalling of Plunger Locked Crossing Junction Stations

By: EG Black
Date Presented: August 27th, 1954


Read More...


195309 – Barnes – Liverpool Street Resignalling

By: A Barnes
Date Presented: September 17th, 1953


Read More...


195209 – Fahey – American Railway Signalling Practice

By: PJ Fahey
Date Presented: December 28th, 2015


Read More...

Scroll to Top